Skip to content
PlanIndex Get alerts
Menu

Planning application

LA10/2026/0013/F

175 Main Street, Lisnaskea, BT92 0JE

Granted Fermanagh and Omagh Full

Proposal

Redevelopment of the existing former public house to form a ground-floor pharmacy, with ancillary spaces and 4no. apartments above.

As published by the council, reference LA10/2026/0013/F

Timeline

Dates from the published record

  1. 8 Jan 2026

    Received by Fermanagh and Omagh

  2. 12 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 1 Jun 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 175 Main Street, Lisnaskea, BT92 0JE

    Proposed demolition of existing building in a conservation area

    20 Feb 2026 0m away Heritage and listed buildings
  • 175 Main Street, Lisnaskea, BT92 0JE

    Discharge of condition 1 (bat survey report) of planning approval LA10/2026/0013/F (redevelopment of pub to pharmacy and 4no. apartments)

    24 Jun 2026 11m away Conditions
  • Goan Meats 183 Main Street, Lisnaskea BT92 0JE

    Change of Use of ground floor from vacant butchers shop to hot food carryout ( Upper floors unaltered)

    31 Oct 2025 18m away Full applications
  • LA10/2026/0639/DCA Awaiting decision

    3 Knocks Road, Lisnaskea, BT92 0HQ

    Proposed demolition of existing boundary stone wall to facilitate road safety improvements.

    2 Jul 2026 211m away Heritage and listed buildings
  • Mcgarry Dental Design 101 Main Street, Lisnaskea, BT92 0JD

    proposed change of use from Class C1 residential to Class D1 community and cultural use, there are no proposed alterations to the building.

    17 Nov 2025 230m away Full applications
  • LA10/2025/1235/F Awaiting decision

    Lands adjacent to No.3 Knocks Road, Lisnaskea

    Proposed extension to existing church car park, alterations to existing public road junction, and installation of enhanced pedestrian footpath network.

    26 Nov 2025 285m away Full applications

In Fermanagh and Omagh

  • LA10/2026/0702/F Awaiting decision

    11 Tullyhill Road, Killashanbally, Maguiresbridge, BT94 4RN

    Proposed single storey front extension

    24 Jul 2026 Full applications
  • Between 59 and 61 Camlough Road, Sixmilecross, Co. Tyrone, BT79 9LN

    Dwelling & Garage-change of house type previously approved under LA10/2023/2088/O & LA10/2024/0752/RM (dwelling & garage)

    11 Jun 2026 Full applications
  • Adjacent to and NE of 63 Tirquin Road, Omagh

    Renewal of Planning Permission LA10/2021/1495/F (Erection of Dwelling)

    8 Jun 2026 Full applications
  • 1 Fallaghearn Road, Fallaghearn, Sixmilecross, Tyrone, BT79 9HZ

    Proposed ground floor extension to front of dwelling

    3 Jun 2026 Full applications
  • LA10/2026/0690/F Awaiting decision

    Lands to the northeast of the existing Loughmacrory Hill Service Reservoir, approximately 0.5km northeast of No.32 Coolaharan Road, Loughmacrory, Sixmilecross, BT79 9LP

    Proposed construction of a 5 megalitre Service Reservoir at Loughmacrory Hill including outlet infrastructure, upgrading and extending the existing site access road, perimeter fencing and landscaping, and all associated site works.

    22 Jul 2026 Full applications