Skip to content
PlanIndex Get alerts
Menu

Planning application

LA10/2025/1145/F

10 Castle Street, Omagh, BT78 1DD

Awaiting decision Fermanagh and Omagh Full

Proposal

Change of use from ground floor shop unit & first and second floor offices to 3no. 1 bed self contained flats and 1no. bedsit.

As published by the council, reference LA10/2025/1145/F

Timeline

Dates from the published record

  1. 4 Nov 2025

    Received by Fermanagh and Omagh

  2. 6 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Fermanagh and Omagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA10/2026/0429/F Awaiting decision

    6, 6a,& 6b Georges Street, Omagh, BT78 1DE

    Change of use and internal reconfiguration from offices to 1No 1Bed Apartment and 1No 2Bed Apartment

    29 Apr 2026 111m away Full applications
  • LA10/2026/0677/F Awaiting decision

    1 Mcconnell Place, Omagh, BT78 1BY

    Proposed change of use of First Floor Restaurant to professional offices and reconfiguration of ground floor kitchens

    21 Jul 2026 135m away Full applications
  • First Trust Bank 8 High Street, Omagh, BT78 1BH

    Internal alterations to the ground floor of existing bank building

    2 Mar 2026 154m away Heritage and listed buildings
  • 24 John Street, Omagh, BT78 1DW

    Change of use of existing dry cleaners to fast food takeaway

    11 Sep 2025 191m away Full applications
  • 9 High St, Omagh

    Proposed covered outdoor entertainment area and internal alterations to Daly's Bar, 9 High Street, Omagh

    15 Dec 2025 212m away Full applications
  • Nationwide Building Society , 20 High Street, Omagh, Tyrone, BT78 1BQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    4 Jun 2026 215m away Heritage and listed buildings

In Fermanagh and Omagh

  • LA10/2026/0702/F Awaiting decision

    11 Tullyhill Road, Killashanbally, Maguiresbridge, BT94 4RN

    Proposed single storey front extension

    24 Jul 2026 Full applications
  • Between 59 and 61 Camlough Road, Sixmilecross, Co. Tyrone, BT79 9LN

    Dwelling & Garage-change of house type previously approved under LA10/2023/2088/O & LA10/2024/0752/RM (dwelling & garage)

    11 Jun 2026 Full applications
  • Adjacent to and NE of 63 Tirquin Road, Omagh

    Renewal of Planning Permission LA10/2021/1495/F (Erection of Dwelling)

    8 Jun 2026 Full applications
  • 1 Fallaghearn Road, Fallaghearn, Sixmilecross, Tyrone, BT79 9HZ

    Proposed ground floor extension to front of dwelling

    3 Jun 2026 Full applications
  • LA10/2026/0690/F Awaiting decision

    Lands to the northeast of the existing Loughmacrory Hill Service Reservoir, approximately 0.5km northeast of No.32 Coolaharan Road, Loughmacrory, Sixmilecross, BT79 9LP

    Proposed construction of a 5 megalitre Service Reservoir at Loughmacrory Hill including outlet infrastructure, upgrading and extending the existing site access road, perimeter fencing and landscaping, and all associated site works.

    22 Jul 2026 Full applications