Planning application

Lands approximately 120m southwest of Tremoge Substation and approximately 73m northwest of 136 Loughmallon Road, Tremoge, Pomeroy, County Tyrone BT70 2SX

Granted Fermanagh and Omagh LA10/2025/0207/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed erection of a 48MW Battery Energy Storage System (BESS) Facility including MV skids (transformer and inverter), outdoor switchgear compound, DNO substation control room, welfare unit, spare parts container, switch room, new site boundary fencing and ancillary development works.

As published by the council, reference LA10/2025/0207/F

Application record

Reference
LA10/2025/0207/F
Type
Full
Status
Determined
Decision
Granted
Received
25 Feb 2025
Validated
28 Feb 2025
Decided
17 Jun 2026
Ward
Termon
Postcode
BT70 2SX

Timeline

Dates from the published record

  1. 25 Feb 2025

    Received by Fermanagh and Omagh

  2. 28 Feb 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jun 2026

    Decision issued: Granted

  4. 25 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Holywood

218 applications on PlanIndex · across 39 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

63 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Fermanagh and Omagh

  • LA10/2026/0864/F Awaiting decision

    118 Glenlevan Road, Churchill, Derrygonnelly, Enniskillen, BT93 2DB

    New access lane to approved dwelling

    4 Sep 2026 Full applications
  • 68 Barony Road, Mountfield, Omagh, BT79 7QF

    Proposed new access to an existing dwelling

    5 Nov 2025 Full applications
  • LA10/2026/0856/F Awaiting decision

    43 Castlebalfour Road, Lisnaskea, BT92 0LT

    Proposed dwelling extension and all associated site works. Amendments of design to previously approved dwelling extension 'Proposed rear/ side ground floor and rear first floor extensions'. Ref: LA10/2025/0406/F.

    2 Sep 2026 Full applications
  • LA10/2026/0851/F Awaiting decision

    Dooneen Development Association 47 Dooneen Road, Tempo, BT94 3GW

    Proposed outbuilding for Community Centre storage and use by local Men's Shed Association

    1 Sep 2026 Full applications
  • LA10/2026/0852/F Awaiting decision

    30 Church Hill Road, Churchill, Derrygonnelly, BT93 6EW

    Erection of dwelling and domestic garage, change of house design to that previously approved under application ref. L/2009/0950/RM

    1 Sep 2026 Full applications