Skip to content
PlanIndex Get alerts
Menu

Planning application

Bank House 6 - 7 Market Place Whittlesey Cambridgeshire

Granted Fenland F/YR21/0763/LB Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal works to a listed building including the installation of cupboards and a stud wall to first floor

As published by the council, reference F/YR21/0763/LB

Application record

Reference
F/YR21/0763/LB
Type
Listed Building Consent
Status
Granted
Decision
Granted
Received
29 Apr 2021
Validated
5 Jul 2021
Decided
17 Sep 2021
Ward
St Andrews Whittlesey
Parish
Whittlesey Town Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 29 Apr 2021

    Received by Fenland

  2. 5 Jul 2021

    Validated

    Checked as complete and ready for consideration.

  3. 17 Sep 2021

    Decision issued: Granted

  4. 13 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: F/96/0642/LB (Application withdrawn)

Who's behind it

Company information only, from the register and Companies House

Taylor Planning and Building Agent, a planning consultancy

11 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • FROM AGENT Correspondence · 09 Sep 2021
  • CONSERVATION Consultee Comment · 17 Aug 2021
  • TOWN COUNCIL Consultee Comment · 06 Aug 2021
  • WHITTLESEY TOWN COUNCIL Consultee Comment · 05 Aug 2021
  • SITE NOTICE Site Notice · 02 Aug 2021
  • SITE PHOTOS Photo · 28 Jul 2021
  • HISTORIC ENVIRONMENT TEAM Consultee Comment · 27 Jul 2021
  • SCHEDULE OF WORKS Other · 05 Jul 2021
  • LOCATION PLAN AND SITE PLAN Drawing · 05 Jul 2021
  • EXISTING AND PROPOSED FLOOR PLANS AND ELEVATIONS Drawing · 05 Jul 2021
  • (& PLANNING STATEMENT) Design & Access Statement · 05 Jul 2021

Trade members open them from here.

Open the documents

What this grant of permission means

Fenland granted permission on 17 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Fenland

  • F/YR26/0667/LB Awaiting decision

    85A Norwich Road Wisbech Cambridgeshire PE13 2AU

    Installation of CCTV cameras to existing shop

    7 Sep 2026 Heritage and listed buildings
  • F/YR26/0535/LB Granted

    Black Cat Cottage 16 Gracious Street Whittlesey Peterborough Cambridgeshire PE7 1AP

    Internal and external works to a listed dwelling involving the demolition of attached garden store, internal works to re-arrange ground floor plan and replacement 3 x windows in east elevation, insertion of 2 x patio doors and blocking up existing doorway in west elevation

    30 Jun 2026 Heritage and listed buildings
  • F/YR26/0504/LB Granted

    60 North Brink Wisbech Cambridgeshire

    External works to a listed building, involving replacement of external door and general repair works

    11 May 2026 Heritage and listed buildings
  • F/YR26/0494/LB Refused

    5 Market Place Whittlesey Cambridgeshire

    External works to a listed building including the erection of an attached 1.8m high screen and 2.4m high wall

    20 May 2026 Heritage and listed buildings
  • F/YR26/0475/LB Granted

    Yucca House 301 Main Road Church End Parson Drove Wisbech Cambridgeshire PE13 4LF

    Internal and external works to a listed building to enable the conversion of existing barn to create additional living accommodation, and erection of a single-storey rear extension to existing dwelling

    4 Jun 2026 Heritage and listed buildings