W H Feltham And Son Limited Estover Road March Cambridgeshire PE15 8SF

Granted Fenland F/YR21/0284/F Full Planning Permission

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erect a care home (2-storey 56 x bed) and associated works, involving the demolition of existing factory

As published by the council, reference F/YR21/0284/F

Application record

Reference
F/YR21/0284/F
Type
Full Planning Permission
Status
Granted
Decision
Granted
Received
15 Feb 2021
Validated
9 Mar 2021
Decided
10 Sep 2021
Ward
March North
Parish
March Town Council
Decision by
Delegated Decision
Postcode
PE15 8SF

Timeline

Dates from the published record

  1. 15 Feb 2021

    Received by Fenland

  2. 9 Mar 2021

    Validated

    Checked as complete and ready for consideration.

  3. 10 Sep 2021

    Decision issued: Granted

  4. 7 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: F/YR20/0674/O (Granted)

Who's behind it

Company information only, from the register and Companies House

DWA Architects (London) Ltd Agent, an architecture practice

8 applications on PlanIndex · across 7 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

85 documents on file for this application

  • EMAIL EXCHANGE RE: AGREEMENT TO PRE-COMMENCEMENT CONDITIONS PLUS DISCUSSION ON R Correspondence · 10 Sep 2021
  • PCC WILDLIFE OFFICER Consultee Comment · 10 Aug 2021
  • PROPOSED ELEVATIONS 1 (NORTH EAST AND SOUTH EAST) Drawing · 06 Aug 2021
  • PROPOSED ELEVATIONS 2 (NORTH WEST AND SOUTH WEST) Drawing · 06 Aug 2021
  • 3D IMAGE - SHEET 1 Drawing · 06 Aug 2021
  • 3D IMAGE - SHEET 2 Drawing · 06 Aug 2021
  • PROPOSED FIRST FLOOR PLAN Drawing · 06 Aug 2021
  • PROPOSED ROOF PLAN Drawing · 06 Aug 2021
  • PROPOSED SITE PLAN Drawing · 06 Aug 2021
  • ECOLOGY REPORT Report · 08 Jul 2021
  • EMAIL FROM AGENT RE: AMENDED ROOF PLAN Correspondence · 07 Jul 2021
  • SUPERSEDED ROOF PLAN Drawing · 07 Jul 2021
  • PROPOSED DETAILED PLANTING PLAN Drawing · 07 Jul 2021
  • PROPOSED LANDSCAPING LAYOUT Drawing · 07 Jul 2021
  • PROPOSED LANDSCAPING SKETCH LAYOUT Drawing · 07 Jul 2021
  • EMAIL EXCHANGE RE: LANDSCAPING PLANS Correspondence · 07 Jul 2021
  • SUPERSEDED ELEVATIONS SE FRONT & NE SIDE CANCELLED · 14 Jun 2021
  • SUPERSEDED 3D VIEWS CANCELLED · 14 Jun 2021
  • SUPERSEDED 3D VIEWS (SHEET 2) CANCELLED · 14 Jun 2021
  • FIRST FLOOR PLAN Drawing · 14 Jun 2021
  • EMAIL FROM AGENT RE: AMENDED ELEVATIONS Correspondence · 14 Jun 2021
  • BUILDING SPACINGS Drawing · 08 Jun 2021
  • EMAIL FROM AGENT RE: BUILDING SPACINGS Correspondence · 08 Jun 2021
  • FDC ENV. HEALTH Consultee Comment · 28 May 2021
  • CCC HIGHWAYS Consultee Comment · 20 May 2021
  • SUPERSEDED SITE LAYOUT AND ACCESS PLAN CANCELLED · 19 May 2021
  • EMAIL FROM AGENT RE: SITE LAYOUT AND ACCESS PLAN Correspondence · 19 May 2021
  • CAMBS CCC - FLOOD AND WATER TEAM Consultee Comment · 11 May 2021
  • CCC TRANSPORT TEAM Consultee Comment · 10 May 2021
  • EMAIL FROM AGENT RE: UPDATED GROUND INVESTIGATION REPORT Correspondence · 04 May 2021
  • GROUND INVESTIGATION REPORT Report · 04 May 2021
  • IMPERMEABLE AREAS PLAN Drawing · 23 Apr 2021
  • DRAINAGE - APPENDIX E: SUDS CALCULATIONS Report · 23 Apr 2021
  • PROPOSED DRAINAGE LAYOUT Drawing · 23 Apr 2021
  • DRAINAGE: DESK STUDY WITH WALKOVER SURVEY Report · 23 Apr 2021
  • PROPOSED FOUL AND SURFACE WATER DRAINAGE STRATEGY Report · 23 Apr 2021
  • EMAIL FROM APPLICANT RE: AMENDED DRAINAGE DETAILS Correspondence · 23 Apr 2021
  • FDC TREE OFFICER Consultee Comment · 19 Apr 2021
  • L AND J BROOKS Neighbour Response · 19 Apr 2021
  • ANGLIAN WATER PLAN SHOWING HYDRANT LOCATIONS Drawing · 19 Apr 2021
  • EMAIL FROM AGENT RE: HYDRANT LOCATIONS Drawing · 19 Apr 2021
  • MR ALEX TANNER Public Comment · 15 Apr 2021
  • MARCH TOWN COUNCIL Consultee Comment · 13 Apr 2021
  • S NEWMAN Neighbour Response · 13 Apr 2021
  • CCC HIGHWAYS Consultee Comment · 12 Apr 2021
  • CAMBS CC - FLOOD AND WATER TEAM Consultee Comment · 09 Apr 2021
  • CAMBS - FIRE & RESCUE SERVICES Consultee Comment · 06 Apr 2021
  • NATURAL ENGLAND Consultee Comment · 01 Apr 2021
  • ANGLIAN WATER Consultee Comment · 01 Apr 2021
  • PCC WILDLIFE OFFICER Consultee Comment · 01 Apr 2021
  • CAMBS CONSTABULARY Consultee Comment · 29 Mar 2021
  • BIDWELLS Neighbour Response · 29 Mar 2021
  • TREE SURVEY Report · 09 Mar 2021
  • TRANSPORT STATEMENT Statement · 09 Mar 2021
  • PROPOSED LANDSCAPE MANAGEMENT AND MAINTENANCE PLAN Report · 09 Mar 2021
  • HEALTH IMPACT ASSESSMENT Report · 09 Mar 2021
  • SUPERSEDED LANDSCAPING PLAN CANCELLED · 09 Mar 2021
  • SUPERSEDED LANDSCAPING PLAN CANCELLED · 09 Mar 2021
  • SUPERSEDED LANDSCAPING PLAN CANCELLED · 09 Mar 2021
  • SUPERSEDED ECOLOGY REPORT Report · 09 Mar 2021
  • SUPERSEDED DRAINAGE STRATEGY CANCELLED · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX J (ANGLIAN WATER - PRE PLANNING REPORT) Report · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX I (DOWNSTREAM DEFENDER DATA SHEET) Report · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX H (AQUACELL CORE SPECIFICATION) Report · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX G (DRAINAGE SURVEY) Report · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX F (DRAINAGE LAYOUT AND DETAILS) Report · 09 Mar 2021
  • SUPERSEDED DRAINAGE STRATEGY - APPENDIX E (SUDS CALCULATIONS) CANCELLED · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX D (SOAKAWAY TESTS RESULTS) Report · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX C (ANGLIAN WATER RECORDS) Report · 09 Mar 2021
  • SUPERSEDED DRAINAGE STRATEGY - APPENDIX B (IMPERMEABLE AREAS) CANCELLED · 09 Mar 2021
  • DRAINAGE STRATEGY - APPENDIX A (EXISTING AND PROPOSED SITE PLAN) Report · 09 Mar 2021
  • COVERING LETTER Other · 09 Mar 2021
  • COPY OF NOTICE (TO OWNER) Other · 09 Mar 2021
  • CONTAMINATED LAND REPORT - PHASE 2 Report · 09 Mar 2021
  • PROPOSED BLOCK PLAN Drawing · 09 Mar 2021
  • EXISTING SITE PLAN Drawing · 09 Mar 2021
  • SUPERSEDED SITE PLAN CANCELLED · 09 Mar 2021
  • SUPERSEDED ROOF PLAN CANCELLED · 09 Mar 2021
  • SUPERSEDED FIRST FLOOR PLAN CANCELLED · 09 Mar 2021
  • PROPOSED GROUND FLOOR PLAN Drawing · 09 Mar 2021
  • SUPERSEDED 3D IMAGES CANCELLED · 09 Mar 2021
  • SUPERSEDED 3D IMAGES CANCELLED · 09 Mar 2021
  • PROPOSED SITE SECTIONS Drawing · 09 Mar 2021
  • SUPERSEDED NW (REAR) AND SW (SIDE) ELEVATIONS CANCELLED · 09 Mar 2021
  • SUPERSEDED SE (FRONT) AND NE (SIDE) ELEVATIONS CANCELLED · 09 Mar 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Fenland granted permission on 10 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • W H Feltham And Son Limited Estover Road March Cambridgeshire

    F/YR23/0262/NONMAT Submitted 17 Feb 2023 50 yards away

    Non-material amendment: Addition of PV panels to the flat roof and amendments to change plant room windows to louvers/doors relating to Planning permission F/YR22/1015/VOC (Variation of condition 20 (list of approved drawings) relating to planning permission F/YR22/0083/F (Erect a care home (2-storey 56 x bed) and associated works) as per schedule of changes)

    Granted Amendments Windows or glazing 4 docs
  • Estover Playing Field Estover Road March Cambridgeshire

    F/YR26/3066/COND Submitted 20 Apr 2026 150 yards away

    Details reserved by condition 11 (ditch/watercourse) of planning permission F/YR17/0030/F (Regeneration of playing field to include: erection of a single-storey pavilion, formation of a car park; artificial grass pitches (AGP); multi-use games area (MUGA); hard-standing for external terrace and walkways; siting of 3 x storage containers; erection of 4.5m high (max height) mesh fencing bounding both the AGP and MUGA; the erection of 4 x 8.0m high lighting columns to car park and footpaths; 6 x 10.0m high floodlights to MUGA and 6 x 15.0m high floodlights to AGP and the formation of a public footpath)

    Granted Conditions 7 docs
    Small domestic
  • Estover Playing Field Estover Road March Cambridgeshire

    F/YR26/3063/COND Submitted 13 Apr 2026 150 yards away

    Details reserved by condition 6 (Site access), 10 (Footway), 12 (Management & Maintenance Scheme), 13 (Community Use Agreement) and 14 (Noise Management Plan) of planning permission F/YR17/0030/F (Regeneration of playing field to include: erection of a single-storey pavilion, formation of a car park; artificial grass pitches (AGP); multi-use games area (MUGA); hard-standing for external terrace and walkways; siting of 3 x storage containers; erection of 4.5m high (max height) mesh fencing bounding both the AGP and MUGA; the erection of 4 x 8.0m high lighting columns to car park and footpaths; 6 x 10.0m high floodlights to MUGA and 6 x 15.0m high floodlights to AGP and the formation of a public footpath)

    Granted Conditions 17 docs
    Small domestic
  • Estover Playing Field Estover Road March Cambridgeshire

    F/YR26/3093/COND Submitted 25 Jun 2026 150 yards away

    Details reserved by condition 19 (surface water drainage scheme) of planning permission F/YR17/0030/F (Regeneration of playing field to include: erection of a single-storey pavilion, formation of a car park; artificial grass pitches (AGP); multi-use games area (MUGA); hard-standing for external terrace and walkways; siting of 3 x storage containers; erection of 4.5m high (max height) mesh fencing bounding both the AGP and MUGA; the erection of 4 x 8.0m high lighting columns to car park and footpaths; 6 x 10.0m high floodlights to MUGA and 6 x 15.0m high floodlights to AGP and the formation of a public footpath

    Refused Conditions 15 docs
    Small domestic
  • 4 Swan Court March Cambridgeshire PE15 8PF

    F/YR26/0427/TRTPO Submitted 26 May 2026 200 yards away

    Works to 1 x Sycamore tree covered by TPO M/2/465/5

    Granted Trees 5 docs
  • 212 Station Road March Cambridgeshire PE15 8SQ

    F/YR26/0175/F Submitted 18 Feb 2026 250 yards away

    90% historically approved · decision due ~30 Apr

    Erect 14 x dwellings with cycle store following demolition of the existing Station Hotel

    Awaiting decision Full applications Demolition 49 docs

In Fenland

  • F/YR26/0613/F Granted

    Amansara Sandbank Wisbech St Mary Wisbech Cambridgeshire PE13 4SE

    Erect single storey rear extension to existing dwelling

    Received 6 Aug, published by the council 21 Aug 2026 Full applications
  • F/YR26/0482/F Granted

    Land West Of Prospect House Farm Whittlesey Road March Cambridgeshire

    Erect 2 x dwellings and the formation an access involving the demolition of 2 x agricultural buildings

    Received 15 May, published by the council 23 Jul 2026 Full applications
  • F/YR26/0380/F Granted

    Land South Of Enfield Burrowmoor Road March Cambridgeshire

    Erect 1 x self-build/custom build dwelling and erect fence 1.8m high (max)

    Received 27 Apr, published by the council 23 Jul 2026 Full applications
  • F/YR26/0603/F Refused

    TP24 West Park Street Chatteris Cambridgeshire

    Conversion of existing building into 8 x flats involving the erection of a single-storey side/rear link extension and a 1.2 (max height) brick/railing front boundary wall

    Received 30 Jul, published by the council 14 Aug 2026 Full applications
  • F/YR26/0602/F Granted

    28 Clarkson Avenue Wisbech Cambridgeshire PE13 2EQ

    Erect a single-storey rear extension to existing dwelling

    Received 10 Aug, published by the council 14 Aug 2026 Full applications