Skip to content
PlanIndex Get alerts
Menu

Planning application

North Of 9 Gas Road March Cambridgeshire

Granted Fenland F/YR19/3116/COND Discharge of condition

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details reserved by condition 3 (a) and (b) of planning permission F/YR18/0891/F (Erection of 5 x 2-storey 3-bed dwellings involving demolition of existing building)

As published by the council, reference F/YR19/3116/COND

Application record

Reference
F/YR19/3116/COND
Type
Discharge of condition
Status
Approved
Decision
Granted As published: Approve
Received
28 Oct 2019
Validated
31 Oct 2019
Decided
29 Nov 2019
Ward
March West
Parish
March Town Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 28 Oct 2019

    Received by Fenland

  2. 31 Oct 2019

    Validated

    Checked as complete and ready for consideration.

  3. 29 Nov 2019

    Decision issued: Approve

  4. 21 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: F/YR18/0891/F (Granted)

Who's behind it

Company information only, from the register and Companies House

A L S Designs Services Agent, a design practice

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • EH COMMENTS Consultee Comment · 20 Nov 2019
  • PROPOSAL FOR A SUPPLEMENTARY GROUND INVESTIGATION, REMEDIATION STRATEGY AND REME Other · 31 Oct 2019
  • GROUND INVESTIGATION REPORT Other · 31 Oct 2019
  • DECISION NOTICE F/YR18/0891/F Other · 31 Oct 2019

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Fenland granted permission on 29 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Army Cadet Force And Air Training Corps Centre Gas Road March Cambridgeshire PE15 9LU

    F/YR24/0542/FDL Submitted 5 Mar 2024 50 yards away

    Alterations to existing building including installation of mezzanine floor, replacement windows, doors and roof, insertion of roof lights, erection of a flag pole (7m high max) and boundary fence (2m high max) and cycle rack including demolition of the attached building

    Granted Loft or dormer Demolition +1 42 docs
    Small domestic
  • 120C High Street March Cambridgeshire PE15 9LP

    F/YR21/0802/CERTP Submitted 16 Jun 2021 100 yards away

    Certificate of lawfulness (Proposed) - convert existing garage to form additional living accommodation to existing dwelling (in association with proposed C4 use)

    Granted Lawful development 2 docs
    Domestic
  • 95 High Street March Cambridgeshire PE15 9LH

    F/YR26/0571/TRCA Submitted 24 Jul 2026 100 yards away

    Works to 3 x Cherry trees and 1 x Buddleia Tree within a Conservation Area

    Granted Trees 8 docs
  • 5 Millfield Close March Cambridgeshire PE15 9HL

    F/YR26/0361/TRTPO Submitted 30 Apr 2026 200 yards away

    Fell 1 x Lime tree covered by TPO 02/1984

    Refused Trees 2 docs
  • 72 - 74 High Street March Cambridgeshire

    F/YR24/3119/COND Submitted 23 Aug 2024 200 yards away

    Details reserved by Condition 1 (Management and Maintenance of Landscaping) and 3 (Materials for Hardstanding) of planning permission F/YR22/0295/RM (Reserved Matters application relating to detailed matters of landscaping pursuant to outline planning permission F/YR20/0370/O to erect 11no 3-storey flats (6x3-bed and 5x2-bed) with part ground floor retail/office (outline application with matters committed in respect of access, appearance, layout and scale) involving demolition of existing building within a Conservation Area)

    Granted Conditions New dwelling Demolition 9 docs
  • 29 Stonecross Way March Cambridgeshire PE15 9DH

    F/YR26/0713/F Submitted 23 Sep 2026 250 yards away

    90% historically approved · decision due ~19 Nov

    Installation of 2 x Split Air-conditioning units to existing dwelling

    Awaiting decision Full applications 11 docs
    Domestic

In Fenland

  • Land South West Of 2 Beechwood Yard Cattle Dyke Gorefield Cambridgeshire

    Details reserved by conditions 02 (drainage), 03 (materials) and 04 (landscape) of planning permission F/YR25/0496/F (Erect 1 x self-build/custom build dwelling)

    Received 6 Aug, published by the council 14 Aug 2026 Conditions
  • 6 Bridge Lane Wimblington March Cambridgeshire PE15 0RS

    Details reserved by conditions 1 (planting following demolition) and 4 (landscaping scheme) of planning permission F/YR25/0084/F (Change of use of land to domestic land, erection of a shed and formation of hardstanding involving the demolition of existing garage (retrospective))

    Received 26 Aug, published by the council 7 Sep 2026 Conditions
  • F/YR26/3141/COND Awaiting decision

    Land East Of 19 Silver Street March Cambridgeshire

    Details reserved by Condition 04 (Construction Environmental Management Plan: Biodiversity) of planning permission F/YR22/1268/O (Erect 2 x dwellings)

    Received 30 Sep, published by the council 6 Oct 2026 Conditions
  • F/YR26/3140/COND Awaiting decision

    Land North Of 20 Eastwood Industrial Estate Eastwood End Wimblington Cambridgeshire

    Details reserved by conditions 4 (surface water drainage scheme), 5 (surface water drainage system) and 7 (surface water run-off) of Planning permission F/YR22/0783/F (Change of use from agricultural field to a builder's yard (B2) including the siting of a portacabin office, and erection of aggregate bays and a 2.4m palisade fence, and the formation of a swale)

    Received 29 Sep, published by the council 6 Oct 2026 Conditions
  • F/YR26/3138/COND Awaiting decision

    43 The Fold Coates Peterborough Cambridgeshire PE7 2BP

    Details reserved by conditions 10 (construction environmental management plan), 11 (surface water run-off) and 12 (temporary facilities) of Planning permission F/YR22/0786/O (Erect up to 9 x dwellings, involving the demolition of existing dwelling and agricultural buildings (outline application with matters committed in relation to access))

    Received 28 Sep, published by the council 6 Oct 2026 Conditions