Planning application
P/24/1096/DP/D
Faraday Business Park Spitfire Way Fareham PO13 9FY
Proposal
Discharge Of Condition 16 (Site Investigation) For Planning Application P/24/1096/Fp - Construction Of An Employment Unit Within Use Class E(G), B2 And B8, With Ancillary Offices
As published by the council, reference P/24/1096/DP/D
Timeline
Dates from the published record
-
19 Jun 2026
Received by Fareham
-
25 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
P/24/1096/MA/A Decided
Faraday Business Park Spitfire Way Fareham PO13 9FY
Non-Material Changes To The Layout, Elevations And Drainage Strategy Of P/24/1096/Fp (Construction Of An Employment Unit Within Use Class E(G), B2 And B8, With Ancillary Offices As Well As Car Parking, Service Yards, Landscaping, Ancillary Structures And Associated Works)
-
P/23/1155/MA/D Decided
Faraday Business Park Broom Way Fareham PO13 9FY
Non-Material Amendment Application To P/23/1155/Fp (Search And Rescue Training Centre) - Changes To The Plant Area
-
P/23/1155/DP/E Decided
Faraday Business Park Broom Way Fareham PO13 9FY
Discharge Of Conditions: 22 (Archaeological Report), & 24 (Biodiversity Net Gain) Of P/23/1155/Fp - Construction Of A Search And Rescue Training Centre With Access, Parking, Landscaping And Other Associated Works
-
P/24/1096/MA/B Decided
Faraday Business Park Spitfire Way Fareham PO13 9FY
Non-Material Amendment To Construction Working Hours Allowed By Condition 20.
-
P/24/1096/MA/C Decided
Faraday Business Park Broom Way Fareham PO13 9FY
Non-Material Amendment To Conditions 2 (Approved Planning Drawings) 3 (External Materials), 4 (Boundary Treatment), 7 (Landscape Details) And 11 (Biodiversity Net Gain Assessment) Of Planning Application P/24/1096/Fp
-
P/26/0821/AD Decided
Spitfire Way Fareham PO13 9FY
Display Illuminated Fascia Signs On The North, East And South Elevations Of The Building, Two Illuminated Totem Signs At The Main Vehicular Access Points And Three Flagpoles Displaying Flags
Other conditions applications
In Fareham
-
P/21/2041/MA/D Decided
Warsash Maritime Academy Newtown Road Warsash SO31 9ZL
Change Of Wording To Condition 7 - Ground Remediation Works (Fourth And Final Paragraph) To Read: 'On Completion Of The Remediation Works For Each Residential Unit And Prior To The Occupation Of Each Residential Unit Hereby Permitted, A Report Validating The Implementation Of The Approved Remedial Measures (Including Photographic Evidence And 'As Built' Drawings) In Relation To That Residential Unit Shall Be Submitted To And Approved By The Local Planning Authority. The Validation Report Shall Be Written By An Independent Competent Person Details Of Whom Shall Be Submitted To And Approved In Writing By The Local Planning Authority Before The Report Is Submitted For Approval.'
-
P/26/0652/VC Decided
Dodnor Occupation Lane Fareham PO14 4BY
Removal Of Condition 3 (Equestrian Occupancy) Of Approved Application P/16/0051/Fp (Construction Of A Permanent Dwelling For An Equestrian Worker To Replace The Existing Mobile Home)
-
P/26/0071/DP/A Decided
Catisfield Cottage Guest House 1 Catisfield Lane Fareham PO15 5NW
Discharge Of Conditions 3 (Materials), 5 (Bin Store) & 8 (Construction Management Plan) Relating To Planning Application P/26/0071/Fp
-
P/22/0962/DP/H Decided
Hammond Industrial Estate, Unit 9 Stubbington Lane Fareham PO14 2NF
Details Pursuant; Condition 18 (Details Of Gazebos)
-
P/26/0590/LB Decided
Fareham Marina Lower Quay Fareham PO16 0RA
Renovation Of Existing Building To Bring In Line With Currently Building Regulation Requirements For Fire, Health And Safety. To Include Slight Modification Of Staircase, Variation To Approved Floor Layouts, Modification Of Internal Walls And Ceiling With Fire Proof Materials, Glazing And Glass Balustrade In Front Of External Doors To Stop Risk Of Fall, Secondary Double Glazing Of Windows