Proposal
Demolition Of Detached Garage And Construction Of Detached Dwelling
As published by the council, reference P/23/0222/FP
Timeline
Dates from the published record
-
13 Feb 2023
Received by Fareham
-
20 Feb 2023
Validated
Checked as complete and ready for consideration.
-
26 Aug 2024
Decision issued: Yes
-
31 Jul 2026
Added to PlanIndex
What happens at appeal
The process from here
This application is at appeal, which passes the decision from the council to the national planning inspectorate, or in Scotland usually to a local review body first. The appeal considers the scheme afresh against the same policies.
Anyone who commented on the original application is normally notified and can comment again within the appeal deadline. Appeal decisions take months rather than weeks, and the outcome replaces the council's decision.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/23/0319/FP Decided
21 Cams Hill Fareham PO16 8RB
Single Storey Rear Extension And Extend The Existing Side Dormer
-
P/23/0248/PH Decided
26 The Ridgeway Fareham Hampshire PO16 8RE
Single Storey Rear Extension To Measure 4.0 Metres Deep (Added To The Existing Rear Extension) 3.9 Metres High, With An Eaves Height Of 2.9 Metres
-
P/24/1492/TO Decided
2 Ventnor Way Fareham PO16 8RU
T19 Walnut Protected By Tpo549: Reduce Branches Back To Previous Natural Target Pruning Points, With The Maximum Diameter Of The Live Pruning Wounds Being < Than 75Mm. The Tree Would Be Dead Wooded At This Time Too.
-
P/25/1247/TO Decided
16 St Catherines Way Fareham PO16 8RL
T1 Oak: Reduction Of The East Side Of The Tree By Approximately 2M To Gain Clearance From The Telephone Cable. Crown Raise Over The Road To 5.2 For Road Clearance, Reduce To Give 2M Gap From Lamppost (Southern And Eastern Sides) And Reduce A Lateral Limb On The North Side By 2M As It Has Blown Out Of The Natural Shape.T2 Yew: Reduce Small Diameter Limbs On The East Side Of The Tree To Provide Clearance From The Phone Cable. All Pruning Wounds Will Be <75Mm.Trees Protected By Tpo549.
-
P/25/1367/FP Decided
73 The Causeway Fareham PO16 8RW
First Floor Rear Extension, Loft Conversion Including Hip To Gable End With Rear Dormer, Installation Of 31 Solar Panels And One Air Source Heat Pump
-
P/23/0637/MA/A Decided
65 The Causeway Fareham PO16 8RW
Non Material Amendment To Planning Application P/23/0637/Fp - Amended Fenestration To Extension And Amended Layout Of Garden Building
Other full applications applications
In Fareham
-
P/26/0813/FP Decided
4 Tulip Gardens Locks Heath SO31 6GB
Two Storey Rear Extension And First Floor Side Window
-
P/26/0814/FP Decided
1 Nathaniel Close Fareham SO31 7NT
Single Storey Rear Extension And Partial Conversion Of Garage To Form Home Gym
-
P/26/0694/FP Decided
7 Hamble Close Warsash Southampton SO31 9GT
First-Floor Side Extension, Over Existing Attached Garage And Associated Internal Alterations.
-
P/26/0688/FP Decided
130 Locks Heath Park Road Park Gate Southampton SO31 6LZ
Double Storey Side Extension And Porch Roof With Carport Replacement.
-
P/26/0803/FP Decided
The Coach House 331 Titchfield Road Titchfield Fareham PO14 3ES
Front, Rear And Side Extensions, Roof Alterations Including Dormers, Internal Remodel And Replacement Detached Pool/Gym Building