Planning application
Unit 4 Bowhouse Terrace Bowhouse Road Grangemouth
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of Door
As published by the council, reference P/26/0290/FUL
Application record
- Reference
- P/26/0290/FUL
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 13 Jul 2026
- Validated
- 20 Jul 2026
- Ward
- Grangemouth
- Parish
- Grangemouth Community Council
- Decision by
- under Delegated Powers
Timeline
Dates from the published record
-
13 Jul 2026
Received by Falkirk
-
20 Jul 2026
Validated
Checked as complete and ready for consideration.
-
16 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Falkirk took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Falkirk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Bowhouse Hotel Bowhouse Road Grangemouth FK3 0HD
Change of Use from Shop (Class 1A) to Hot Food Take-Away (Sui Generis)
Granted Full applications 6 docs -
34 Morar Place Grangemouth FK3 0HG
Alteration to Flatted Dwelling (Installation of Roof Windows and Conversion of Attic Space)
Granted Full applications Windows or glazingDomestic -
18 Ard Court Grangemouth FK3 0HL
Extension to Dwellinghouse
Granted Full applications Extension 6 docsDomestic -
Site To The North East Of 6 Sealock Court Bowhouse Road Grangemouth
Installation of 18m Monopole, Cabinet and Associated Ancillary Works
Granted Telecoms 13 docs -
24 Kinloch Place Grangemouth FK3 0EB
98% historically approved · decision due ~6 Oct
Extension to Dwellinghouse
Awaiting decision Full applications ExtensionDomestic -
1 Brooke Lane Grangemouth FK3 8TB
Extension to Dwellinghouse
Withdrawn Full applications Extension 5 docsDomestic
Other full applications applications
In Falkirk
-
P/25/0448/FUL Granted
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse and Garage
-
P/26/0289/FUL Granted
26 Adam Crescent Stenhousemuir Larbert FK5 4DQ
Extension to Dwellinghouse
-
P/25/0474/FUL Granted
19 Steps Street Stenhousemuir Larbert FK5 4LH
Extension to Dwellinghouse
-
P/26/0254/FUL Granted
1 Muir Street Stenhousemuir Larbert FK5 3HZ
Extension to Dwellinghouse
-
P/26/0128/FUL Granted
M'Dina Dunmore Falkirk FK2 8LY
Extension to Dwellinghouse