Planning application
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of Dwellinghouse
As published by the council, reference P/26/0068/MSC
Application record
- Reference
- P/26/0068/MSC
- Type
- Matters Specified in Conditions
- Status
- Decided
- Decision
- Approval of Matters Specified in Conditi
- Received
- 12 Feb 2026
- Validated
- 16 Feb 2026
- Decided
- 29 May 2026
- Parish
- Banknock, Haggs and Longcroft
- Decision by
- under Delegated Powers
Site history
Applications at this address on the Falkirk register
This site has had 4 applications since 2025: 4 approved, 0 refused.
-
P/26/0068/FUL Granted
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse
-
P/25/0493/FUL Granted
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse
-
P/25/0448/FUL Granted
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse and Garage
Timeline
Dates from the published record
-
12 Feb 2026
Received by Falkirk
-
16 Feb 2026
Validated
Checked as complete and ready for consideration.
-
29 May 2026
Decision issued: Approval of Matters Specified in Conditi
-
27 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Munro Consulting Agent, registered in Slough
Active · incorporated 2017 · Slough
5 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- Decision notice
- (approved 06a) block plan
- (approved 02a) proposed site plan
- (approved 03a) proposed elevations
- Drainage calculations
- Phase 1 desk study report
- Phase 2 ground investigation report
- Non-householder application
- (approved 05) ground and garage floor plans
- (approved 04) elevation and section
- Design statement
- (approved 01) location plan
- Non-householder application
Trade members open them from here.
Open the documentsWhat this grant of permission means
Falkirk granted permission on 29 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse
Granted Conditions 13 docsDomestic -
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse and Garage
Granted Full applications 20 docsDomestic -
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse
Granted Conditions 15 docsDomestic -
Maple Lodge Braeface Road Banknock Bonnybridge FK4 1UE
Continuation of Use of Temporary Building as Coffee Shop
Granted Full applications 4 docs -
Maple Lodge Braeface Road Banknock Bonnybridge FK4 1UE
Continuation of Use of Temporary Building as Coffee Shop
Granted Full applications 5 docs -
Victoria House Braeface Road Banknock Bonnybridge FK4 1UE
Construction of Stable Block (Retrospective) and Associated Development
Granted Full applications 9 docs
Other condition discharge and variation applications
In Falkirk
-
P/22/0519/COND01 Granted
Land To The South Of 1 - 9 Bridge Street Bridge Street Bonnybridge
Compliance with Conditions 3, 4, 5, 6, 7, and 10 of P/22/0519/FUL - Construction of 6 Flatted Dwellings and Associated Car Parking
-
P/21/0723/NMV01 Awaiting decision
Site To The North Of 37 Rosebank Avenue Dunipace
Amendment to P/21/0723/FUL - Construction of 87 Dwellinghouses and Associated Works
-
P/25/0196/COND02 Awaiting decision
The Comptons Stewart Avenue Bo'ness
Construction of 3 Dwellinghouses and Associated Infrastructure (Amendment to P/24/0506/FUL)
-
P/26/0110/MSC Granted
Land To The South Of Bo'ness Fire Station Crawfield Road Bo'ness
Residential Development with Associated Access, Parking, Landscaping, Open Space and Drainage
-
P/25/0085/COND02 Awaiting decision
The Carron Centre Ronades Road Falkirk FK2 7TA
Compliance with Conditions of P/25/0085/FUL - Construction of 78 Dwellings with Associated Landscaping, Access and Infrastructure