Planning application
189 High Street Falkirk FK1 1DU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conversion and Alterations to Shop Units to Form 2 Flatted Dwellings (Sui-Generis) and 1 Shop Unit (Class 1)
As published by the council, reference P/22/0563/FUL
Application record
- Reference
- P/22/0563/FUL
- Type
- Planning Permission
- Status
- Decided
- Decision
- Grant Planning Permission
- Received
- 7 Nov 2022
- Validated
- 7 Nov 2022
- Decided
- 9 Mar 2023
- Ward
- Falkirk South
- Parish
- No Community Council
- Decision by
- under Delegated Powers
- Postcode
- FK1 1DU
Timeline
Dates from the published record
-
7 Nov 2022
Received by Falkirk
-
9 Mar 2023
Decision issued: Grant Planning Permission
-
4 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Falkirk
47 applications on PlanIndex · across 7 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Site To The North Of 201-203 High Street High Street Falkirk
98% historically approved · decision due ~29 Sep
Installation of Street Hub Unit (Digital Display)
Awaiting decision Full applications 12 docs -
Site To The North Of 201-203 High Street High Street Falkirk
97% historically approved · decision due ~29 Sep
Display of Illuminated Advertisements (Digital Display)
Awaiting decision Advertising 12 docs -
1 East Bridge Street Falkirk FK1 1YD
Display of Non-Illuminated Advertisements
Granted Advertising 4 docs -
1 East Bridge Street Falkirk FK1 1YD
Change of Use From Shop (Class 1A) to Hot Food Takeaway (Sui Generis), Installation of Extraction Flue and Painting of Unit Exterior
Granted Full applications 7 docs -
147 - 149 High Street Falkirk FK1 1DZ
Alterations to Shopfront
Granted Heritage and listed buildings Windows or glazing 15 docs -
147 - 149 High Street Falkirk FK1 1DZ
Internal Alterations
Granted Heritage and listed buildings 8 docs
Other full applications applications
In Falkirk
-
P/25/0448/FUL Granted
Land To The East Of Maple Lodge Braeface Road Banknock Bonnybridge
Construction of Dwellinghouse and Garage
-
P/26/0289/FUL Granted
26 Adam Crescent Stenhousemuir Larbert FK5 4DQ
Extension to Dwellinghouse
-
P/25/0474/FUL Granted
19 Steps Street Stenhousemuir Larbert FK5 4LH
Extension to Dwellinghouse
-
P/26/0254/FUL Granted
1 Muir Street Stenhousemuir Larbert FK5 3HZ
Extension to Dwellinghouse
-
P/26/0128/FUL Granted
M'Dina Dunmore Falkirk FK2 8LY
Extension to Dwellinghouse