Planning application

Barclays Bank, 5 The Parade, Minehead, TA24 5LS

Granted Exmoor National Park 3/21/22/090 Full Planning Permission

Works: Loft or dormer Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of vacant retail space previously serving as a vault into 1 no. residential apartment, with minor alterations to insert a new rooflight and windows, and conversion of existing coach house to form 1 no. dwelling.

As published by the council, reference 3/21/22/090

Application record

Reference
3/21/22/090
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Grant
Received
25 Aug 2022
Validated
20 Sep 2022
Decided
17 Mar 2023
Ward
(SWT)Minehead Central
Parish
Minehead
Decision by
Chair/Vice Chair referral
Postcode
TA24 5LS

Timeline

Dates from the published record

  1. 25 Aug 2022

    Received by Exmoor National Park

  2. 20 Sep 2022

    Validated

    Checked as complete and ready for consideration.

  3. 17 Mar 2023

    Decision issued: Grant

  4. 2 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Base Architecture and Design Ltd Agent, an architecture practice registered in Shrewsbury

Active · incorporated 2003 · Shrewsbury

48 applications on PlanIndex · across 10 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Exmoor National Park granted permission on 17 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Market House, The Parade, Minehead, TA24 5NB

    3/21/20/081 Submitted 28 Oct 2020 50 yards away

    Change of use from B1(a) (now Use Class E) to C3(a) in order to form 1no. dwelling

    Granted Full applications 27 docs
    Domestic
  • Market House, The Parade, Minehead, TA24 5NB

    3/21/20/082 Submitted 28 Oct 2020 50 yards away

    Internal and external alterations to form 1no. dwelling

    Granted Heritage and listed buildings 26 docs
    Domestic
  • 7 Holloway Street, Minehead, TA24 5NP

    3/21/24/057 Submitted 31 Jul 2024 50 yards away

    Demolition of small lean-to structure adjoining west boundary of dwelling

    Granted Other Demolition
    Domestic
  • 8 Wellington Square, Minehead, TA24 5NH

    3/21/21/036 Submitted 1 Apr 2021 50 yards away

    Change of use of first floor from storage for the ground floor cafe into 1 No. flat

    Granted Full applications 25 docs
    Domestic
  • 2 Wellington Square, Minehead, TA24 5NH

    3/21/19/075 Submitted 9 Aug 2019 50 yards away

    Display of 1 No. externally illuminated fascia sign and 1 No. internally illuminated projecting sign

    Withdrawn Advertising 14 docs
  • The Cottage, Holloway Street, Minehead, TA24 5NR

    3/21/25/040 Submitted 1 Sep 2025 100 yards away

    Variation of Condition No. 02 (approved plans) of application 3/21/24/063 for alterations to driveway

    Granted Amendments 17 docs

In Exmoor National Park

  • 08/26/00087 Granted

    Royal Clarence House, High Street, Bridgwater, Somerset, TA6 3BH

    Internal reconfiguration works to create separate office units.

    Received 29 Sep, published by the council 12 Oct 2026 Full applications
  • 08/26/00086 Granted

    Morrisons, Broadway, Bridgwater, Somerset, TA6 3LN

    Creation of electric vehicle (EV) charging zone, including erection of EV charging points, canopy, sub-station enclosure, low voltage (LV) panel, meter cabinet, plant room and associated works.

    Received 5 Oct, published by the council 12 Oct 2026 Full applications
  • 53/26/00014 Granted

    12 Grays Avenue, Westonzoyland, Bridgwater, Somerset, TA7 0HP

    Erection of single storey rear extension

    Received 1 Oct, published by the council 12 Oct 2026 Full applications
  • 18/26/00006 Granted

    2 Fowlers Farm Cottages, Fowlers Plot Road, Chedzoy, Bridgwater, TA7 8RH

    Erection of two storey side extension (South) and single storey rear extension (West).

    Received 30 Sep, published by the council 12 Oct 2026 Full applications
  • 46/26/00005 Granted

    SUTTON MILL FARM, Moor Road, Sutton Mallet, Bridgwater, Somerset, TA7 9AR

    Construction of Agricultural Livestock Building

    Received 29 Sep, published by the council 12 Oct 2026 Full applications