Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Parkhouse Road, Minehead, TA24 8AD

Granted Exmoor National Park 3/21/21/066 Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear extension and decking area

As published by the council, reference 3/21/21/066

Application record

Reference
3/21/21/066
Type
Full Planning Permission
Status
Decided
Decision
Grant
Received
25 Jun 2021
Validated
25 Jun 2021
Decided
19 Aug 2021
Ward
(SWT)Periton & Woodcombe
Parish
Minehead
Decision by
Delegated
Postcode
TA24 8AD

Timeline

Dates from the published record

  1. 25 Jun 2021

    Received by Exmoor National Park

  2. 19 Aug 2021

    Decision issued: Grant

  3. 16 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 47 Parkhouse Road, Minehead, TA24 8AD

    3/21/26/048 Submitted 20 Aug 2026 0m away

    91% historically approved · decision due ~16 Oct

    Removal of existing flat roofs and construction of replacement pitched roofs, including continuation of the existing main roof over the utility room, WC and entrance hall, and formation of a new gable projection over the principal bedroom.

    Awaiting decision Full applications 9 docs
  • 47 Parkhouse Road, Minehead, TA24 8AD

    3/21/26/048 Submitted 20 Aug 2026 0m away

    91% historically approved · decision due ~16 Oct

    Removal of existing flat roofs and construction of replacement pitched roofs, including continuation of the existing main roof over the utility room, WC and entrance hall, and formation of a new gable projection over the principal bedroom.

    Awaiting decision Full applications 9 docs
  • 9 Lower Park, Minehead, TA24 8AX

    3/21/26/007 Submitted 15 Feb 2026 111m away

    Erection of single storey rear and side extension

    Granted Full applications Extension 16 docs
    Small domestic
  • 9 Lower Park, Minehead, TA24 8AX

    3/21/26/007 Submitted 15 Feb 2026 111m away

    Erection of single storey rear and side extension

    Granted Full applications Extension 16 docs
    Small domestic
  • Ground Floor Flat, 2 West Park, Minehead, TA24 8AW

    3/21/23/089 Submitted 17 Oct 2023 154m away

    Erection of single storey extensions to the front and rear elevations and conversion of garage to a bedroom with ensuite

    Granted Full applications Extension 19 docs
    Small domestic
  • 19 Lower Park, Minehead, TA24 8AY

    3/21/20/084 Submitted 9 Nov 2020 236m away

    Erection of a two storey and single storey extension to the rear and a single storey extension to the side

    Granted Full applications Extension 14 docs
    Small domestic

In Exmoor National Park

  • 24/26/00013 Granted

    Sunnydale, Lake House Lane, East Brent, Highbridge, Somerset, TA9 4HN

    Erection of a two storey extension to the south elevation.

    1 Sep 2026 Full applications
  • 37/26/00064 Granted

    Land to the West of Taunton Road, and North of, Stockmoor Drove, Bridgwater, Somerset, TA6

    Erection of 2No. residental dwellings & garaging

    27 Aug 2026 Full applications
  • 54/26/00006 Granted

    Land to the West of, The Causeway, Woolavington, Bridgwater, Somerset, TA7

    Installation of a synchronous condenser facility, switchroom, with ancillary 400kV infrastructure, and associated works including upgraded access, internal drives, diversion of 33kV overhead line and cable connection to New Woolavington Substation.

    20 Aug 2026 Full applications
  • 14/26/00008 Granted

    Brambles, Little Leaze Lane, Catcott, Bridgwater, Somerset, TA7 9HJ

    Erection of a garage.

    17 Aug 2026 Full applications
  • 08/26/00065 Granted

    2 Binford Place, Bridgwater, Somerset, TA6 3NJ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    17 Aug 2026 Full applications