Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Wild Meadow Farm Bancombe Road Somerton Somerset TA11 6JA

Granted Exmoor National Park 26/00461/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of land to allow the siting of two caravans for holiday use and the erection of a pumphouse & storage building, and related infrastructure

As published by the council, reference 26/00461/FUL

Application record

Reference
26/00461/FUL
Type
Full Application
Status
Approved
Decision
Application Permitted with Conditions
Received
26 Feb 2026
Validated
6 Mar 2026
Decided
14 May 2026
Ward
SOMERTON
Parish
Somerton
Decision by
Delegated (Use on Recommendations)
Postcode
TA11 6JA

Timeline

Dates from the published record

  1. 26 Feb 2026

    Received by Exmoor National Park

  2. 6 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 May 2026

    Decision issued: Application Permitted with Conditions

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

35 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land At Wild Meadow Farm Bancombe Road Somerton Somerset TA11 6JA

    26/00461/FUL Submitted 26 Feb 2026 0m away

    Change of use of land to allow the siting of two caravans for holiday use and the erection of a pumphouse & storage building, and related infrastructure

    Granted Full applications 35 docs
  • Wild Meadow Farm Bancombe Road Somerton Somerset TA11 6JA

    26/00623/DOC1 Submitted 16 Mar 2026 60m away

    Discharge of Condition No.03 (Schedule of Materials) of planning application 24/01102/FUL.

    Decided Conditions 3 docs
  • Land Directly East Of Somerton Door Farm Somerton Door Drove Somerton Somerset TA11 6JN

    26/01217/EIASS Submitted 27 May 2026 378m away

    Screening Opinion (Regulation 6) for the proposed construction, operation, maintenance and eventual decommissioning of up to a 20MW Solar Farm, comprising the construction of solar panels mounted on metal frames, inverters, auxiliary transformer, substation, storage container, DNO substation, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, landscaping, temporary construction compound and all ancillary grid infrastructure and associated site works

    Decided Outline 2 docs
  • Land Directly East Of Somerton Door Farm Somerton Door Drove Somerton Somerset TA11 6JN

    26/01217/EIASS Submitted 27 May 2026 378m away

    Screening Opinion (Regulation 6) for the proposed construction, operation, maintenance and eventual decommissioning of up to a 20MW Solar Farm, comprising the construction of solar panels mounted on metal frames, inverters, auxiliary transformer, substation, storage container, DNO substation, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, landscaping, temporary construction compound and all ancillary grid infrastructure and associated site works

    Decided Outline 2 docs

In Exmoor National Park

  • 24/26/00013 Granted

    Sunnydale, Lake House Lane, East Brent, Highbridge, Somerset, TA9 4HN

    Erection of a two storey extension to the south elevation.

    1 Sep 2026 Full applications
  • 37/26/00064 Granted

    Land to the West of Taunton Road, and North of, Stockmoor Drove, Bridgwater, Somerset, TA6

    Erection of 2No. residental dwellings & garaging

    27 Aug 2026 Full applications
  • 54/26/00006 Granted

    Land to the West of, The Causeway, Woolavington, Bridgwater, Somerset, TA7

    Installation of a synchronous condenser facility, switchroom, with ancillary 400kV infrastructure, and associated works including upgraded access, internal drives, diversion of 33kV overhead line and cable connection to New Woolavington Substation.

    20 Aug 2026 Full applications
  • 14/26/00008 Granted

    Brambles, Little Leaze Lane, Catcott, Bridgwater, Somerset, TA7 9HJ

    Erection of a garage.

    17 Aug 2026 Full applications
  • 08/26/00065 Granted

    2 Binford Place, Bridgwater, Somerset, TA6 3NJ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    17 Aug 2026 Full applications