Skip to content
PlanIndex Get alerts
Menu

Planning application

24/01058/FUL

Land West Of School Lane Ashill Ilminster Somerset

Decided Exmoor National Park Full Application

Proposal

Proposal of detached carports to plots 2, 3, 4 and 6 & 7.

As published by the council, reference 24/01058/FUL

Timeline

Dates from the published record

  1. 29 Apr 2024

    Received by Exmoor National Park

  2. 15 May 2024

    Validated

    Checked as complete and ready for consideration.

  3. 12 Nov 2024

    Decision issued: None determination of Application

  4. 2 Aug 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01443/FUL Awaiting decision

    Land Os 3727 Part Windmill Hill Lane Ashill Ilminster Somerset TA19 9PA

    Change of use of land and erection of 30 dwellings including means of access, landscaping, drainage attenuation and associated works

    22 Jun 2026 319m away Full applications

In Exmoor National Park

  • 33/26/00012 Granted

    Stepping Stones, Fishers Lane, Mark, Highbridge, Somerset, TA9 4LZ

    Erection of a single Storey Side (South) Extension.

    29 Jul 2026 Full applications
  • 37/26/00048 Granted

    DISTRIBUTION WAREHOUSE, Huntworth Business Park, North Petherton, Bridgwater, TA6 6TS

    Variation of conditions 2 and 3 of planning permission 37/25/00102 (Change of Use of land from Use Class B8 (Storage and Distribution) and E(g)(i) (Offices) to a Mixed Use B2 (General Industrial), B8 (Storage and Distribution) and E(g)(i) (Offices), and erection of 7No. temporary structures comprising 3No. structures for storage, 1No. structure for fabrication/welding, 1No. structure to house radiography equipment, and 2No. welfare cabins until 31st December 2030 (part retrospective)) to amend the plans approved.

    29 Jul 2026 Full applications
  • 50/26/00046 Granted

    West End House, West End, Wedmore, Somerset, BS28 4BD

    This application seeks consent for a range of internal and external works to the house. Internally, the works comprise of alterations to the fireplace in the sitting room, a new gateway within the existing cupboard by the front door, and the installation of a Tesla Powerwall inside the barn. Externally, the works comprise of joinery repairs to the barn gable door; replacement of the barn door and kitchen door with new doors; a new glasshouse on the site of the previous one; removal of the existing modern shed in the garden and its replacement with a new shed, relocated to the end of the garden; roof repairs to the privy; installation of new joinery to conceal a new electric vehicle charging point in the car park; and installation of solar panels.

    23 Jul 2026 Full applications
  • 13/26/00011 Granted

    Bridgwater And Taunton College Cannington Campus Crockers Centre, Marsh Lane, Cannington, Bridgwater, Somerset, TA5 2HZ

    Siting of 9No. pre-fabricated classroom pods & 1No. services/storage building.

    27 Jul 2026 Full applications
  • 08/26/00061 Granted

    Bridgwater Community Hospital, Salmon Parade, Bridgwater, Somerset, TA6 5AH

    Change of use of gatehouse (Use Class E(e)) to dedicated bat mitigation building (Sui Generis) with the installation of bat tiles and bat dormer to roof and demountable boarding to ground floor windows, and repair/replacement of roof slates and ridge tiles as needed.

    21 Jul 2026 Full applications