Skip to content
PlanIndex Get alerts
Menu

Planning application

93 Alphington Road Exeter EX2 8JD

Awaiting decision Exeter 26/1227/LPD Lawfulness of Proposed Use/Development

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Certificate of Lawfulness for proposed use class C4, Small HMO for 3 residents.

As published by the council, reference 26/1227/LPD

Application record

Reference
26/1227/LPD
Type
Lawfulness of Proposed Use/Development
Status
Pending Consideration
Received
13 Aug 2026
Validated
13 Aug 2026
Ward
Alphington
Postcode
EX2 8JD

Timeline

Dates from the published record

  1. 13 Aug 2026

    Received by Exeter

  2. 26 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Exeter took a median of 50 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy

37 applications on PlanIndex · across 5 councils · 73% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Exeter for determination, against a statutory target of eight weeks. Over the last year Exeter decided lawful development applications in a median of 47 days. More in our guide to how long planning decisions take.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 8 Crawford Gardens Exeter Devon EX2 8HQ

    22/1322/VOC Submitted 26 Sep 2022 44m away

    Variation of Condition 2 to 22/0549/FUL; change of design relates to removal of planting.

    Granted Amendments 7 docs
  • 58 Alphington Road Exeter EX2 8HU

    24/0658/DIS Submitted 11 Jun 2024 76m away

    Discharge of Condition 3 (material samples) of 23/0460/FUL, and conditions 3 (material samples) and 4 (window details) of 23/0494/LBC

    Decided Conditions Windows or glazing 4 docs
  • 64 Alphington Road Exeter EX2 8HX

    26/0746/CAT Submitted 26 May 2026 77m away

    Fruit Tree pruning in accordance with BS 3998:2010 Tree Work Recommendations. T1 Pear Tree Reduce the overall canopy of the tree as follows: Reduce the height of the tree by approximately 2.0 m, leaving a final overall height of 4.0 m. Reduce the radial crown spread by approximately 2.0 m, leaving a final radial spread of 3.0m at all compass points. All works shall retain the trees main framework and natural form, maintaining a high proportion of the foliage-bearing structure. Crown lift by removing secondary and sub-lateral branch growth only, to provide a vertical clearance of approximately 1.80 m between ground level and the lowest foliage tips, thereby achieving the desired clearance. All final pruning cuts shall be made at suitable growth points in accordance with BS 3998:2010 Tree Work Recommendations. Individual pruning wounds shall not exceed 60 mm in diameter. T2,3,4 & 5 Apple Trees Reduce the overall canopy of the tree as follows: Reduce the height of the tree by approximately 2.0 m, leaving a final overall height of 4.0 m. Reduce the radial crown spread by approximately 2.0 m, leaving a final radial spread of 3.50m at all compass points. All works shall retain the trees main framework and natural form, maintaining a high proportion of the foliage-bearing structure. Crown lift by removing secondary and sub-lateral branch growth only, to provide a vertical clearance of approximately 1.80 m between ground level and the lowest foliage tips, thereby achieving the desired clearance. All final pruning cuts shall be made at suitable growth points in accordance with BS 3998:2010 Tree Work Recommendations. Individual pruning wounds shall not exceed 60 mm in diameter.

    Granted Trees 4 docs
  • 63 Queens Road Exeter EX2 9EW

    25/0739/FUL Submitted 10 Jun 2025 94m away

    Demolition of garage and garden room. Replacement garage, alterations, ground floor side and rear extensions. Alterations to driveway and front boundary wall.

    Granted Full applications Extension Demolition 28 docs
    Small domestic
  • 92 Alphington Road Exeter EX2 8HZ

    26/0073/LED Submitted 17 Jan 2026 96m away

    Use of the building as two self contained flats (C3 use) (Certificate of lawfulness of existing use)

    Decided Lawful development New dwelling 9 docs
  • 74 Queens Road Exeter Devon EX2 9EW

    23/0273/CAT Submitted 25 Feb 2023 107m away

    T1 - Norway Maple: Fell

    Granted Trees 4 docs

In Exeter

  • 26/1307/LED Awaiting decision

    22 King William Street Exeter EX4 6PD

    House in multiple occupation for four people (C4 use) (Certificate of lawfulness of existing use)

    29 Aug 2026 Lawful development
  • 26/1306/LED Awaiting decision

    24 King William Street Exeter EX4 6PD

    House in multiple occupation for four people (C4 use) (Certificate of lawfulness of existing use)

    28 Aug 2026 Lawful development
  • 26/1279/LPD Awaiting decision

    2 Churchill Road Exeter EX2 9BU

    Certificate of Lawfulness for proposed loft conversion with flat roof rear dormer window.

    28 Aug 2026 Lawful development
  • 26/1299/LPD Awaiting decision

    6 St Annes Road Exeter EX1 2QD

    Loft conversion with rear dormers and a roof light to the front elevation, along with associated works to increase the property from a five person to a six person HMO (C4 Use)

    27 Aug 2026 Lawful development
  • 26/1214/LPD Decided

    2 Pennsylvania Close Exeter EX4 6DJ

    Certificate of Lawfulness for proposed hip to gable end roof enlargement with rear dormer.

    11 Aug 2026 Lawful development