Planning application
Holiday Inn Guardian Road Exeter EX1 3PE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Determination of whether prior approval is required for the installation of a roof-mounted solar PV system, comprising of 288 x 450w modules, totalling 129.6 kWp.
As published by the council, reference 26/1149/PDPV
Application record
- Reference
- 26/1149/PDPV
- Type
- Prior Approval - Solar Panels (Part 14)
- Status
- Decided
- Decision
- Granted As published: Prior Approval Not Required
- Received
- 31 Jul 2026
- Validated
- 31 Jul 2026
- Decided
- 4 Sep 2026
- Ward
- Pinhoe
- Decision by
- Delegated Decision
- Postcode
- EX1 3PE
Timeline
Dates from the published record
-
31 Jul 2026
Received by Exeter
-
12 Aug 2026
Added to PlanIndex
-
4 Sep 2026
Decision issued: Prior Approval Not Required
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 4 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Honiton Road/Ambassador Drive/Moor Lane Roundabout Exeter
Four sponsorship signs to be placed on the roundabout
Granted Advertising 10 docs -
Ambassador Drive/Emperor Way/Grenadier Road Roundabout Exeter
Four sponsorship signs to be placed on the roundabout
Granted Advertising 10 docs -
Brewers Fayre Fitzroy Road Exeter EX1 3LJ
83% historically approved · decision due ~17 Nov
Reconfiguration of existing restaurant to provide additional hotel bedrooms, additional air conditioning units, external alterations and associated works.
Awaiting decision Full applications -
Electricity Distribution Centre Moor Lane Exeter Devon
Condition Discharge: Condition 8 (Waste Audit Statement) of approval 22/1633/FUL
Granted Conditions 4 docs -
Electricity Distribution Centre Moor Lane Exeter Devon
Condition Discharge: Condition 6 (Construction Management Plan) of approval 22/1633/FUL
Granted Conditions 13 docs -
Electricity Distribution Centre Moor Lane Exeter Devon
Redevelopment of Electricity Distribution Depot including existing building demolition, access road extension, new depot and maintenance facilities and associated external works
Granted Full applications Extension Demolition 59 docs
Other prior approval applications
In Exeter
-
26/1471/PD Awaiting decision
42 Chard Road Exeter EX1 3AX
Prior approval for single storey rear extension measuring 6m deep x 3.9m max. height x 2.9m eaves height.
-
26/1032/PDPV Granted
Ashford Llp Ashford House Grenadier Road Exeter EX1 3LH
Installation of roof mounted 104.88kW solar PV system comprising of 228 x Canadian Solar 460w modules
-
26/1394/PDPV Awaiting decision
1 The Lyndons Lyndhurst Road Exeter EX2 4PT
Installation of a roof-mounted 15-panel solar photovoltaic (PV) array.
-
26/1383/PD Awaiting decision
22 Lower Hill Barton Road Exeter EX1 3EH
Prior Approval for a single storey rear extension measuring 4.40 m deep x 2.7 m high x 2.70 eaves height.
-
26/0912/PDPV Granted
Mardon House Wonford Road Exeter EX2 4UD
Installation of 160 solar panels and associated works