Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0810/FUL

39 Chestnut Avenue Exeter EX2 6DL

Awaiting decision Exeter Full Planning Permission

Proposal

Single storey front extension.

As published by the council, reference 26/0810/FUL

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Exeter

  2. 9 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Exeter for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0811/LPD Decided

    39 Chestnut Avenue Exeter EX2 6DL

    Single storey rear extension to dwelling.

    4 Jun 2026 0m away Lawful development
  • 25/1248/ADV Granted

    Burnthouse Lane/ Chestnut Avenue Roundabout Exeter

    Two sponsorship signs to be placed on the roundabout

    11 Sep 2025 162m away Advertising
  • 25/1231/FUL Granted

    134 Burnthouse Lane Exeter EX2 6NB

    Front porch, rear extension, and brick paving driveway.

    10 Sep 2025 194m away Full applications
  • 25/1249/ADV Granted

    Rifford Road/ Burnthouse Lane/ Coronation Road/ Ludwell Lane Roundabout Exeter

    Two sponsorship signs to be placed on the roundabout

    11 Sep 2025 317m away Advertising
  • 25/1804/PDPV Granted

    Jasmine Lodge Dryden Road Exeter EX2 5SN

    Installation of rooftop photo-voltaic solar panels.

    19 Dec 2025 335m away Prior approval
  • 26/0460/FUL Refused

    Land At Rear Of 8 Dryden Road Exeter

    Two storey building for use as a House in Multiple Occupation for up to 16 persons (Sui Generis)

    28 Mar 2026 336m away Full applications

In Exeter

  • 26/1126/FUL Awaiting decision

    Unit B 134 Fore Street Exeter EX4 3AN

    Change of use of an existing storage unit (Use Class B8) to a small-scale artisan micro-bakery (Use Class E(g)(iii)), including occasional ancillary educational workshops.

    27 Jul 2026 Full applications
  • 26/0780/FUL Granted

    Granville 47A Langaton Lane Pinhoe Exeter EX1 3SP

    Replacement of existing conservatory with single storey rear extension.

    1 Jun 2026 Full applications
  • 26/0850/FUL Granted

    Lockfield Court Ide Lane Alphington Exeter EX2 8UZ

    Replacement of existing uPVC windows with new energy efficient uPVC windows. Replacement of timber doors with energy efficient uPVC framed doors (like for like design and fenestration).

    11 Jun 2026 Full applications
  • 26/0852/FUL Granted

    31 Feltrim Avenue Exeter EX2 4RP

    Single storey rear extension with deck and pergola.

    11 Jun 2026 Full applications
  • 26/0768/FUL Granted

    8 Richmond Court St Davids Exeter EX4 3RA

    Garage conversion including replacement of garage door with casement window to match existing.

    30 May 2026 Full applications