Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0464/FUL

18 Poltimore Drive Exeter EX1 3DY

Granted Exeter Full Planning Permission

Proposal

Installation of 12 roof-mounted solar photovoltaic panels

As published by the council, reference 26/0464/FUL

Timeline

Dates from the published record

  1. 29 Mar 2026

    Received by Exeter

  2. 3 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 May 2026

    Decision issued: Permitted

  4. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/1265/ADV Granted

    Roundabout Cumberland Way Tithebarn Way Roman Avenue Cumberland Way Pinhoe Exeter

    Four sponsorship signs to be placed on the roundabout

    15 Sep 2025 143m away Advertising
  • 24/1100/LPD Decided

    8 Tithebarn Copse Exeter EX1 3XP

    Minor internal alterations and a proposed rear extension to accomodate a new kitchen and open-plan dining room.

    23 Sep 2024 192m away Lawful development
  • 25/1253/FUL Granted

    1 Broadleaf Close Exeter EX1 3XA

    Side, flat roof extension on south elevation to link existing garage to house and converting the garage to additional ancillary living space with 3x front facing windows, entrance door, and 1x roof light.

    11 Sep 2025 211m away Full applications
  • 25/1722/LPD Decided

    5 Tithebarn Copse Exeter EX1 3XP

    Certificate of Lawfulness for the removal of an existing conservatory and construction of a single-storey rear extension

    4 Dec 2025 242m away Lawful development
  • 25/1494/LPD Decided

    10 Pinn Lane Exeter EX1 3QW

    single storey rear extension.

    23 Oct 2025 271m away Lawful development
  • 25/1391/DIS Granted

    Pinhoe Surgery Pinn Lane Exeter EX1 3SY

    Discharge of Conditions 3, 4, 10 and 11 of Planning Permission Ref. 24/1024/FUL, granted 15 January 2025, relating to Biodiversity Net Gain, construction management, biodiversity enhancements and obscure glazing

    7 Oct 2025 331m away Conditions

In Exeter

  • 26/1126/FUL Awaiting decision

    Unit B 134 Fore Street Exeter EX4 3AN

    Change of use of an existing storage unit (Use Class B8) to a small-scale artisan micro-bakery (Use Class E(g)(iii)), including occasional ancillary educational workshops.

    27 Jul 2026 Full applications
  • 26/0780/FUL Granted

    Granville 47A Langaton Lane Pinhoe Exeter EX1 3SP

    Replacement of existing conservatory with single storey rear extension.

    1 Jun 2026 Full applications
  • 26/0850/FUL Granted

    Lockfield Court Ide Lane Alphington Exeter EX2 8UZ

    Replacement of existing uPVC windows with new energy efficient uPVC windows. Replacement of timber doors with energy efficient uPVC framed doors (like for like design and fenestration).

    11 Jun 2026 Full applications
  • 26/0852/FUL Granted

    31 Feltrim Avenue Exeter EX2 4RP

    Single storey rear extension with deck and pergola.

    11 Jun 2026 Full applications
  • 26/0768/FUL Granted

    8 Richmond Court St Davids Exeter EX4 3RA

    Garage conversion including replacement of garage door with casement window to match existing.

    30 May 2026 Full applications