Planning application
Aperture Pynes Hill Rydon Lane Exeter EX2 5SP
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension to the existing car park to provide a further 39 car parking spaces, with new lighting and new EV charging points and associated landscaping.
As published by the council, reference 25/1779/FUL
Application record
- Reference
- 25/1779/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 15 Dec 2025
- Validated
- 15 Dec 2025
- Decided
- 28 Apr 2026
- Ward
- Priory
- Decision by
- Delegated Decision
- Postcode
- EX2 5SP
Timeline
Dates from the published record
-
15 Dec 2025
Received by Exeter
-
28 Apr 2026
Decision issued: Permitted
-
26 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
CarneySweeney Ltd Agent, registered in Farnham
Active · incorporated 2019 · Farnham
493 applications on PlanIndex · across 101 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 28 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Aperture Rydon Lane Exeter EX2 5SP
Discharge of Condition 4 on Planning Permission Ref. 25/1137/FUL, dated 10 September 2025, relating to cycle storage
Granted Conditions 4 docs -
Aperture Pynes Hill Exeter EX2 5AZ
Change of use of part of ground floor from offices (Class E(g)(i)) to Medical/Health Services (Class E(e))
Granted Full applications 9 docs -
Aperture Pynes Hill Exeter EX2 5AZ
New cladding and lighting at existing entrance
Granted Full applications 8 docs -
Melrose House Pynes Hill Exeter EX2 5AZ
RETROSPECTIVE: Replacement of existing windows with anthracite grey uPVC double glazed frames.
Granted Full applications Windows or glazing 10 docs -
Rosemoor Court Pynes Hill Exeter EX2 5TU
Building mounted company signage and additions to freestanding street corner directory sign.
Granted Advertising 8 docs -
Vantage Point Pynes Hill Exeter EX2 5FD
The solar photovoltaic (PV) installation is proposed on the roofs of Vantage Point, Pynes Hill, Exeter EX2 5FD. At around 93.28kW in total the proposed PV installation is below the permitted development threshold of 1 Megawatt (MW). Total 212 solar panels will be installed on the proposed building of the site. The roof pitch of the proposed structure is 20 degrees, and the panels will face 219. The total area of the pitched roof is estimated to be ~ 604.34m2. The proposed solar PV equipment has, as far as practicable, been sited to minimise its effect on the external appearance of the building and the amenity of the area. The roof slopes that the solar PV panels will be mounted on are pitched and the PV panels will be mounted on frames parallel to the existing roof pitch so will have a minimal effect on the external appearance of the building and the amenity of the area. The solar PV equipment will not: ?Project more than 200mm from the roof slopes. nor ?Be installed within 1 metre of the external edges of the roofs. The solar PV equipment will be removed as soon as reasonably practicable when no longer needed. The effect of glint and glare are considered to be minimal and localised. Both glint and glare attenuate with distance, with glare reducing rapidly. Several aspects of the installation will reduce the risks further: ?Solar PV panels are purposely designed to absorb rather than reflect light, as any reflection would waste potential energy. The surface of PV panels is intentionally rough to reduce reflection and facilitate absorption of the maximum quantity of sunlight. A 2009 study of solar panels showed that solar panels reflected 3-5% of incoming sunlight, which was less than steel (approximately 46%), standard glass (approximately 10%) or smooth water (approximately 5%). (Source: SunPower Solar Module Glare and Reflectance Technical Notification, T09014, September 2009). ?The aluminium and steel which make up the solar panel frames and mounting
Granted Prior approval 5 docs
Other full applications
In Exeter
-
26/1384/FUL Awaiting decision
15 Parkfield Road Topsham EX3 0DR
New second storey to existing single storey extension to dwelling
-
26/1031/FUL Granted
Auto Shine Car Wash 39 Buller Road Exeter EX4 1DA
Shed with canopy to be used for storage (retrospective application)
-
26/1073/FUL Granted
8 Monmouth Street Topsham EX3 0AJ
Alterations to single storey rear extension
-
26/1155/FUL Granted
1 Penleonard Close Exeter EX2 4NY
Widening of the existing vehicle access and dropped kerb from Penleonard Close; replacing the existing tarmac driveway with a permeable block pavior driveway and the formation of three new parking spaces, and associated alterations to the landscaping.
-
26/0471/FUL Granted
Garage West Of The Coach House Brewery Lane North Street Heavitree Exeter
Refurbishment, restoration and conversion of 2 storey, Grade II listed Building, into a 1 bedroom dwelling, including formation of rear external porch way