Planning application

63 Queens Road Exeter EX2 9EW

Granted Exeter 25/0739/FUL Full Planning Permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of garage and garden room. Replacement garage, alterations, ground floor side and rear extensions. Alterations to driveway and front boundary wall.

As published by the council, reference 25/0739/FUL

Application record

Reference
25/0739/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
10 Jun 2025
Validated
10 Jun 2025
Decided
10 Nov 2025
Ward
St Thomas
Decision by
Delegated Decision
Postcode
EX2 9EW

Timeline

Dates from the published record

  1. 10 Jun 2025

    Received by Exeter

  2. 10 Nov 2025

    Decision issued: Permitted

  3. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Newton Abbot

9 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 74 Queens Road Exeter Devon EX2 9EW

    23/0273/CAT Submitted 25 Feb 2023 17m away

    T1 - Norway Maple: Fell

    Granted Trees 4 docs
  • 78 Queens Road Exeter EX2 9EW

    24/0832/CAT Submitted 22 Jul 2024 17m away

    T1 Cotoneaster. Fell two stems house side

    Granted Trees 4 docs
  • 64 Alphington Road Exeter EX2 8HX

    26/0746/CAT Submitted 26 May 2026 23m away

    Fruit Tree pruning in accordance with BS 3998:2010 Tree Work Recommendations. T1 Pear Tree Reduce the overall canopy of the tree as follows: Reduce the height of the tree by approximately 2.0 m, leaving a final overall height of 4.0 m. Reduce the radial crown spread by approximately 2.0 m, leaving a final radial spread of 3.0m at all compass points. All works shall retain the trees main framework and natural form, maintaining a high proportion of the foliage-bearing structure. Crown lift by removing secondary and sub-lateral branch growth only, to provide a vertical clearance of approximately 1.80 m between ground level and the lowest foliage tips, thereby achieving the desired clearance. All final pruning cuts shall be made at suitable growth points in accordance with BS 3998:2010 Tree Work Recommendations. Individual pruning wounds shall not exceed 60 mm in diameter. T2,3,4 & 5 Apple Trees Reduce the overall canopy of the tree as follows: Reduce the height of the tree by approximately 2.0 m, leaving a final overall height of 4.0 m. Reduce the radial crown spread by approximately 2.0 m, leaving a final radial spread of 3.50m at all compass points. All works shall retain the trees main framework and natural form, maintaining a high proportion of the foliage-bearing structure. Crown lift by removing secondary and sub-lateral branch growth only, to provide a vertical clearance of approximately 1.80 m between ground level and the lowest foliage tips, thereby achieving the desired clearance. All final pruning cuts shall be made at suitable growth points in accordance with BS 3998:2010 Tree Work Recommendations. Individual pruning wounds shall not exceed 60 mm in diameter.

    Granted Trees 4 docs
  • 58 Alphington Road Exeter EX2 8HU

    24/0658/DIS Submitted 11 Jun 2024 47m away

    Discharge of Condition 3 (material samples) of 23/0460/FUL, and conditions 3 (material samples) and 4 (window details) of 23/0494/LBC

    Decided Conditions Windows or glazing 4 docs
  • 48 - 52 Alphington Road Exeter EX2 8HS

    24/0560/FUL Submitted 22 May 2024 59m away

    Proposal to form a new reception entrance by altering a window to an entrance door, proposed steps and handrails

    Granted Full applications Windows or glazing 10 docs
  • 8 Crawford Gardens Exeter Devon EX2 8HQ

    22/1322/VOC Submitted 26 Sep 2022 70m away

    Variation of Condition 2 to 22/0549/FUL; change of design relates to removal of planting.

    Granted Amendments 7 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications