Skip to content
PlanIndex Get alerts
Menu

Planning application

37 Regent Street Exeter EX2 9EH

Granted Exeter 25/0517/FUL Full Planning Permission

Works: Extension Loft or dormer Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of rear lean-to, new two storey rear extension, new rooflights and replacement windows

As published by the council, reference 25/0517/FUL

Application record

Reference
25/0517/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
28 Apr 2025
Validated
28 Apr 2025
Decided
18 Sep 2025
Ward
St Thomas
Decision by
Delegated Decision
Postcode
EX2 9EH

Timeline

Dates from the published record

  1. 28 Apr 2025

    Received by Exeter

  2. 18 Sep 2025

    Decision issued: Permitted

  3. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Newton Abbot

7 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 37 Regent Street Exeter EX2 9EH

    26/0226/DIS Submitted 17 Feb 2026 0m away

    Discharge of conditions 3 - (External Material samples and treatments) and 5 (Roof light sizes and details) of planning approval 25/0517/FUL.

    Decided Conditions Loft or dormer 5 docs
  • 37 Regent Street Exeter EX2 9EH

    25/1603/DIS Submitted 12 Nov 2025 0m away

    Discharge of condition four (window details) of 25/0517/FUL

    Decided Conditions Windows or glazing 3 docs
  • 11 Princes Square Exeter Devon EX2 9AN

    19/1507/FUL Submitted 31 Oct 2019 22m away

    Demolition of existing conservatory and construction of two storey rear extension.

    Granted Full applications Extension Demolition 6 docs
  • 81 Regent Street Exeter EX2 9EH

    24/0759/CAT Submitted 4 Jul 2024 37m away

    1 x Bay tree located next to the boundary fence. - Pollard back to primary pollard points with final cuts made at approximately X3 metres from ground level. Initiate a well-balanced candelabra framework for future branch structure to establish. This tree is encroaching on the dwelling as well as neighbouring properties. A cyclic pruning regime is initiated to increase the longevity of the tree. Reduce the overall shape of the tree by no more than 2.5m from branch tips to suitable pollard points. The post cutting height of the tree will be approximately 3m above ground level. Post cutting canopy radius will be approximately 1.5m. 1 x Elderflower tree located in the middle of the garden. - Reduce the height of the tree by 2m while retaining the main framework & shape of the crown & therefore a high proportion of the foliage bearing structure. All pruning cuts to be made at suitable growth points. - This tree is starting to outgrowth its location and effect neighbouring properties. A cyclic pruning regime is initiated to increase the longevity of the tree. Reduce the height of the tree by no more than 2. from branch tips to suitable pruning points. The post cutting height of the tree will be approximately 4.5m above ground level. Post cutting canopy radius will be approximately 3m. All pruning cuts to be made back to suitable growth points. All works carried out to BS 3998:2010 Tree Works Recommendations

    Granted Trees 4 docs
    Small domestic
  • 9 Princes Square Exeter EX2 9AN

    25/1388/CAT Submitted 7 Oct 2025 42m away

    Pollarding of and ash tree in rear garden Ash tree approx 8-10m tall. Located in a conservation area.

    Granted Trees 5 docs
  • 92 Regent Street Exeter EX2 9EH

    24/1197/CAT Submitted 12 Oct 2024 66m away

    12The tree is not subject to a preservation order. It is highlighted via an arrow in the satellite image accompanying this application. We would like the tree (including stump) to be completely removed from the property via the best method a tree surgeon suggests (we have not consulted one as yet). Principally we are worried the tree roots could damage the patio and other garden features. We also think it could be a potential hazard to our hosue in stormy weather/high winds. The tree also blocks light to the patio and house.

    Granted Trees 5 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications