Planning application
Exeter School Victoria Park Road Exeter EX2 4NS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to determine if prior approval is required for the installation of 194 rooftop solar panels.
As published by the council, reference 24/1298/PD
Application record
- Reference
- 24/1298/PD
- Type
- Prior Approval - Solar Panels (Part 14)
- Status
- Permitted
- Decision
- Granted As published: Prior Approval Required and Granted
- Received
- 29 Oct 2024
- Validated
- 5 Nov 2024
- Decided
- 18 Dec 2024
- Ward
- Newtown And St Leonards
- Postcode
- EX2 4NS
Site history
Applications at this address on the Exeter register
This site has had 7 applications since 2023: 6 approved, 0 refused.
-
26/0843/DIS Awaiting decision
Exeter School Victoria Park Road Exeter EX2 4NS
Discharge of Conditions 3 and 6 on Planning Permission Ref. 25/1526/FUL, granted on 29 April 2026, relating to Construction Management and Floodlighting
-
26/0191/CAT Granted
Exeter School Victoria Park Road Exeter EX2 4NS
T016 - Monterey Pine - T016 Monterey Pine (///pencil.candle.dishes) - remove 3 lowest limbs over path and building and prune back remaining limbs to give 1.5-2 metre clearance.
-
25/1526/FUL Granted
Exeter School Victoria Park Road Exeter EX2 4NS
Construction of 2 x padel tennis courts, floodlighting and associated works.
-
25/0879/LBC Granted
Exeter School Victoria Park Road Exeter EX2 4NS
Replacement of windows, doors and associated works.
-
23/1497/FUL Granted
Exeter School Victoria Park Road Exeter EX2 4NS
Extension to sixth form common room and associated works
-
23/0859/CAT Granted
Exeter School Victoria Park Road Exeter EX2 4NS
T1 - Eucalyptus - Poor form, showing signs of decay at base
Timeline
Dates from the published record
-
29 Oct 2024
Received by Exeter
-
5 Nov 2024
Validated
Checked as complete and ready for consideration.
-
18 Dec 2024
Decision issued: Prior Approval Required and Granted
-
26 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
SunGift Solar Agent, registered in Exeter
Active · incorporated 2007 · Exeter
15 applications on PlanIndex · across 7 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 18 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Exeter School Victoria Park Road Exeter Devon EX2 4NS
T005 - Oak - Urgent removal of Large primary limb which has a horizontal crack extending from its base for 3 metre up limb.
Granted Trees 4 docs -
Exeter School Victoria Park Road Exeter Devon EX2 4NS
T014. Lawson Cypress. install a non-invasive brace should be implemented within 6 months. A ?Cobra? ? style 8T bracing system should be installed at approximately 1/3 of the distance between the union at 3.5m and the branch tips. It is also recommended that the crown height of the tree is reduced by approximately 2m and balanced/shaped appropriately. A secondary branch which displays an axial split at approximately 5m to the western aspect of the crown should be removed at the same time. All works to conform to BS3998.
Granted Trees 5 docs -
Exeter School Victoria Park Road Exeter EX2 4NS
T1 - Eucalyptus - Poor form, showing signs of decay at base
Granted Trees 7 docs -
Exeter School Victoria Park Road Exeter Devon EX2 4NS
Discharge of Conditions three (trees) and four (drainage) of 19/1236/FUL
Granted Conditions Trees 11 docs -
Exeter School Victoria Park Road Exeter Devon EX2 4NS
T1 - Monterey Pine - Remove hanging limb and structurally compromised limb directly above and reduce x1 limb back from building by 2-3 metres.
Granted Trees 2 docs -
Royal Devon And Exeter Hospital Barrack Road Exeter Devon
Discharge of conditions 7 (Travel Plan), 8 (Cycle Parking) and 11 (plant noise) of planning permission 17/1818/FUL RD&E MRI/PET CT unit.
Granted Conditions 11 docs
Other prior approval applications
In Exeter
-
26/1471/PD Awaiting decision
42 Chard Road Exeter EX1 3AX
Prior approval for single storey rear extension measuring 6m deep x 3.9m max. height x 2.9m eaves height.
-
26/1032/PDPV Granted
Ashford Llp Ashford House Grenadier Road Exeter EX1 3LH
Installation of roof mounted 104.88kW solar PV system comprising of 228 x Canadian Solar 460w modules
-
26/1394/PDPV Awaiting decision
1 The Lyndons Lyndhurst Road Exeter EX2 4PT
Installation of a roof-mounted 15-panel solar photovoltaic (PV) array.
-
26/1383/PD Awaiting decision
22 Lower Hill Barton Road Exeter EX1 3EH
Prior Approval for a single storey rear extension measuring 4.40 m deep x 2.7 m high x 2.70 eaves height.
-
26/0912/PDPV Granted
Mardon House Wonford Road Exeter EX2 4UD
Installation of 160 solar panels and associated works