Planning application
St Boniface Church Brookway Exeter EX1 3JH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of four air source heat pumps to the north side of the building.
As published by the council, reference 24/0897/FUL
Application record
- Reference
- 24/0897/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 7 Aug 2024
- Validated
- 5 Sep 2024
- Decided
- 21 Oct 2024
- Ward
- Mincinglake And Whipton
- Decision by
- Delegated Decision
- Postcode
- EX1 3JH
Timeline
Dates from the published record
-
7 Aug 2024
Received by Exeter
-
5 Sep 2024
Validated
Checked as complete and ready for consideration.
-
21 Oct 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Thackeray Road Exeter EX4 8HD
Certificate of Lawfulness for rear, flat roof dormer, relocation of one rear elevation window and 3x front rooflights.
Decided Lawful development Loft or dormer Windows or glazing 8 docs -
9 Thackeray Road Exeter EX4 8HD
Single-storey side extension and extension to rear decking.
Granted Full applications Extension 9 docsSmall domestic -
38 Hillyfield Road Exeter EX1 3ND
Single storey rear extension and front porch
Granted Full applications Extension 13 docsSmall domestic -
1 The Mede Pinhoe Exeter EX4 8ED
Single story extension to the rear of dwelling.
Granted Full applications Extension 18 docsDomestic -
29 Thackeray Road Exeter EX4 8HD
Construction of rear bedroom extension and conversion of existing out-building.
Granted Prior approval Extension 9 docs -
86 Whipton Village Road Exeter EX4 8AL
T1 Liquidambar styraciflua - to fell tree as has become too large for its situation at the front of my property 86 Whipton Village Road, the tree is in raised position approximately three feet above the pavement and branches are causing an obstruction to pedestrians and cyclists using the pavement. The tree is causing damage to the retaining wall between my property and the pavement of Whipton Village Road. The tree is also pushing the boundary wall between my property and my neighbours property 84c. The roots are damaging drains under the pavement of Whipton village Road leading to rat holes apearing amongst the roots at the base of the tree. Please see photos enclosed with application.
Granted Trees 12 docsSmall domestic
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension