Skip to content
PlanIndex Get alerts
Menu

Planning application

20 Chancel Lane Exeter EX4 8PY

Granted Exeter 24/0830/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of two-storey side and single-storey side and rear wraparound extension. New front porch.

As published by the council, reference 24/0830/FUL

Application record

Reference
24/0830/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
22 Jul 2024
Validated
29 Jul 2024
Decided
30 Aug 2024
Ward
Pinhoe
Decision by
Delegated Decision
Postcode
EX4 8PY

Timeline

Dates from the published record

  1. 22 Jul 2024

    Received by Exeter

  2. 29 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 30 Aug 2024

    Decision issued: Permitted

  4. 5 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Exeter

72 applications on PlanIndex · across 7 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20 Chancel Lane Exeter EX4 8PY

    24/0471/LPD Submitted 29 Apr 2024 0m away

    Side extension, rear extension, roof alterations including a dormer roof and roof lights and an outbuilding.

    Decided Lawful development Extension Loft or dormer +1 11 docs
  • 20 Chancel Lane Exeter EX4 8PY

    26/1138/LPD Submitted 29 Jul 2026 0m away

    87% historically approved · decision due ~9 Oct

    Certificate of Lawfulness for proposed change of use from C3 use to C4 use for 6 unrelated people.

    Awaiting decision Lawful development 8 docs
  • 8 Crackington Avenue Exeter EX4 8FR

    25/1521/FUL Submitted 28 Oct 2025 182m away

    Single storey rear extension.

    Granted Full applications Extension 14 docs
    Small domestic
  • 6 Bourn Rise Exeter EX4 8QD

    26/0997/FUL Submitted 2 Jul 2026 212m away

    82% historically approved · decision due ~27 Aug

    Single-storey rear extension and part conversion of garage to enlarge habitable living space.

    Awaiting decision Full applications Extension 10 docs
    Small domestic
  • 64 Finning Avenue Exeter EX4 8FA

    25/1028/FUL Submitted 29 Jul 2025 221m away

    Proposed garage conversion to provide home office and shower room, and rear canopy

    Granted Full applications 15 docs
  • 1 Thursby Walk Exeter EX4 8FD

    25/1022/TPO Submitted 28 Jul 2025 227m away

    G001 - Lime & Sycamore - Laterally reduce the Southern side of the lime trees to produce a minimum of a 3 meters lateral clearance between branch tips and the adjacent residential building. Laterally reduce the East side of the sycamore to ensure a minimum of 4 meters lateral clearance between branch tips and the adjacent residential building. T001 - Ash - Remove and replace with a small leave lime

    Granted Trees 6 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications