Planning application
20 Chancel Lane Exeter EX4 8PY
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of two-storey side and single-storey side and rear wraparound extension. New front porch.
As published by the council, reference 24/0830/FUL
Application record
- Reference
- 24/0830/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 22 Jul 2024
- Validated
- 29 Jul 2024
- Decided
- 30 Aug 2024
- Ward
- Pinhoe
- Decision by
- Delegated Decision
- Postcode
- EX4 8PY
Timeline
Dates from the published record
-
22 Jul 2024
Received by Exeter
-
29 Jul 2024
Validated
Checked as complete and ready for consideration.
-
30 Aug 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Exeter
72 applications on PlanIndex · across 7 councils · 83% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20 Chancel Lane Exeter EX4 8PY
Side extension, rear extension, roof alterations including a dormer roof and roof lights and an outbuilding.
Decided Lawful development Extension Loft or dormer +1 11 docs -
20 Chancel Lane Exeter EX4 8PY
87% historically approved · decision due ~9 Oct
Certificate of Lawfulness for proposed change of use from C3 use to C4 use for 6 unrelated people.
Awaiting decision Lawful development 8 docs -
8 Crackington Avenue Exeter EX4 8FR
Single storey rear extension.
Granted Full applications Extension 14 docsSmall domestic -
6 Bourn Rise Exeter EX4 8QD
82% historically approved · decision due ~27 Aug
Single-storey rear extension and part conversion of garage to enlarge habitable living space.
Awaiting decision Full applications Extension 10 docsSmall domestic -
64 Finning Avenue Exeter EX4 8FA
Proposed garage conversion to provide home office and shower room, and rear canopy
Granted Full applications 15 docs -
1 Thursby Walk Exeter EX4 8FD
G001 - Lime & Sycamore - Laterally reduce the Southern side of the lime trees to produce a minimum of a 3 meters lateral clearance between branch tips and the adjacent residential building. Laterally reduce the East side of the sycamore to ensure a minimum of 4 meters lateral clearance between branch tips and the adjacent residential building. T001 - Ash - Remove and replace with a small leave lime
Granted Trees 6 docs
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension