Skip to content
PlanIndex Get alerts
Menu

Planning application

33 Sybil Mead Exeter EX1 3FA

Granted Exeter 24/0742/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

RETROSPECTIVE: Under deck storage area, below raised wrap-around deck to the rear.

As published by the council, reference 24/0742/FUL

Application record

Reference
24/0742/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
30 Jun 2024
Validated
17 Jul 2024
Decided
13 Aug 2024
Ward
Pinhoe
Decision by
Delegated Decision
Postcode
EX1 3FA

Timeline

Dates from the published record

  1. 30 Jun 2024

    Received by Exeter

  2. 17 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 13 Aug 2024

    Decision issued: Permitted

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Sandrock Nursery Gipsy Hill Lane Exeter EX1 3RP

    23/1251/MDO Submitted 11 Oct 2023 56m away

    Seeking approval to vary schedule 1 part C Section 106 Agreement by deleting paragraphs 14-16 and inserting the most recent wording set out in Encolosure 4 by way of Deed of Variation.

    Granted Conditions 7 docs
  • Land On South Side Of Gipsy Hill Lane, West Of Pinhoe Lodge.

    26/0750/FUL Submitted 27 May 2026 133m away

    82% historically approved · decision due ~25 Aug

    Erection of six 2-storey detached dwellings.

    Awaiting decision Full applications 24 docs
  • Land To The South Of Tithebarn Way Tithebarn Way Exeter

    24/0865/DIS Submitted 30 Jul 2024 137m away

    Discharge condition 23 (SAP calculations) of planning permission 18/1145/OUT - Residential development of up to 80 dwellings (all matters reserved except access).

    Granted Conditions New dwelling 3 docs
    Major scheme
  • Land To The South Of Tithebarn Way Tithebarn Way Exeter

    24/0892/NMA Submitted 6 Aug 2024 138m away

    Non-material amendment: Variation to wording of Condition 2 (approved drawings) and Condition 7 (Drainage) alongside removal of eastern footway, southern footway adjustments, western highway adjustments, removal of gabion structure to the north and regrade embankment, floor level changes, cycle storage positions, repositioned parking, addition of PV panels and substation.

    Granted Amendments 26 docs
  • Pinhoe Lodge Gipsy Hill Lane Exeter EX1 3RJ

    25/1839/FUL Submitted 24 Dec 2025 151m away

    Single storey side extension to main dwelling and single storey extension to garage.

    Granted Full applications Extension 33 docs
    Small domestic
  • Land To The South Of Tithebarn Way Tithebarn Way Exeter Devon

    23/0522/NMA Submitted 25 Apr 2023 152m away

    Non-material amendment of 18/1145/OUT: Variation of delivery schedule of Condition 5 (pedestrian/cycle way) to be constructed in accordance with the highway delivery plan

    Granted Amendments 4 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications