Skip to content
PlanIndex Get alerts
Menu

Planning application

Baring House 6 Baring Crescent Exeter EX1 1TL

Granted Exeter 24/0718/FUL Full Planning Permission

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from offices (B1) and consulting rooms (D1) to residential (C3), new single storey rear extension, replacement windows, detached garage, greenhouse, landscaping and other alterations

As published by the council, reference 24/0718/FUL

Application record

Reference
24/0718/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
25 Jun 2024
Validated
2 Jul 2024
Decided
25 Sep 2024
Ward
Newtown And St Leonards
Decision by
Delegated Decision
Postcode
EX1 1TL

Timeline

Dates from the published record

  1. 25 Jun 2024

    Received by Exeter

  2. 2 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 25 Sep 2024

    Decision issued: Permitted

  4. 5 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

19 applications on PlanIndex · across 3 councils · 88% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

66 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Baring House 6 Baring Crescent Exeter EX1 1TL

    24/0719/LBC Submitted 25 Jun 2024 0m away

    Alterations associated with change of use to residential including single storey rear extension, replacement windows, rooflight, detached garage, greenhouse, internal works to walls, doors, floors and ceilings on all floors, and other external alterations

    Granted Heritage and listed buildings Extension Loft or dormer +1 64 docs
    Small domestic
  • 10 Baring Crescent Exeter EX1 1TL

    24/1277/CAT Submitted 24 Oct 2024 19m away

    24/10/2024T1. Beech. Fell. Meipilus root decay fungus visible around stem base. Crown to west side of tree has died suggesting roots excessively decayed this side of tree. Tree weighted to east therefore suspect stability.

    Withdrawn Trees 4 docs
  • 8 Baring Crescent Exeter EX1 1TL

    24/0312/LBC Submitted 18 Mar 2024 42m away

    Proposed archway between existing living room and new kitchen, new steel beam under kitchen floor.

    Granted Heritage and listed buildings 18 docs
  • 140 Heavitree Road Exeter EX1 2LZ

    25/1712/CAT Submitted 1 Dec 2025 50m away

    T2 - Yew, Reduce southern aspect by 2m, including south east/west aspects to shape. Maximum diameter of cut 50mm.

    Granted Trees 4 docs
  • 142 Heavitree Road Exeter EX1 2NA

    25/1711/CAT Submitted 1 Dec 2025 59m away

    T1 - Fir. Reduce southerly limb growing near to no. 3 The Music Rooms by 2.5m, maximum diameter of cut 75mm.

    Granted Trees 4 docs
  • 11 Baring Crescent Exeter EX1 1TL

    26/0488/CAT Submitted 31 Mar 2026 60m away

    T1 is a large Oak (Quercus robur), 15m north of #10, Baring Crescent. It is proposed that the tree is crown- reduced by an average of 2.4m, overall, the work being carried out as per BS3998:2010

    Refused Trees 6 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications