Skip to content
PlanIndex Get alerts
Menu

Planning application

75 Pinhoe Road Exeter EX4 7HT

Granted Exeter 24/0667/FUL Full Planning Permission

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension, creation of 2 no. off-street parking spaces to rear of property, new side door entrance and additional first floor window in western elevation.

As published by the council, reference 24/0667/FUL

Application record

Reference
24/0667/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
13 Jun 2024
Validated
13 Jun 2024
Decided
30 Aug 2024
Ward
Pennsylvania
Decision by
Delegated Decision
Postcode
EX4 7HT

Timeline

Dates from the published record

  1. 13 Jun 2024

    Received by Exeter

  2. 30 Aug 2024

    Decision issued: Permitted

  3. 5 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

24 applications on PlanIndex · across 5 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 61 Pinhoe Road Exeter EX4 7HS

    24/0419/LPD Submitted 15 Apr 2024 51m away

    Change a 5 person HMO to a 6 person HMO (C4 use) (Certificate of lawfulness of proposed use)

    Decided Lawful development 11 docs
  • 93 Monks Road Exeter EX4 7BE

    25/1115/LED Submitted 15 Aug 2025 66m away

    House in multiple occupation for five people (C4 use) (Certificate of lawfulness of existing use)

    Decided Lawful development 10 docs
  • 112 Pinhoe Road Exeter EX4 7HJ

    25/1172/LED Submitted 28 Aug 2025 87m away

    Use of property as a House in Multiple Occupation (HMO) (Class C4)

    Decided Lawful development 4 docs
  • 26 St Annes Road Exeter Devon EX1 2QD

    21/0927/LPD Submitted 9 Jun 2021 91m away

    Construction of proposed loft conversion with rear dormer and Velux windows to front.

    Decided Lawful development Loft or dormer Windows or glazing 7 docs
  • 20 Commins Road Exeter EX1 2PZ

    26/0980/LED Submitted 1 Jul 2026 102m away

    Certificate of Lawfulness Proposed use as an HMO for 3 people.

    Decided Lawful development 20 docs
  • 64 Monks Road Exeter EX4 7BB

    24/0810/LPD Submitted 16 Jul 2024 116m away

    Removal of existing chimney, with addition of 2 dormer roof extensions, photo-voltaic panels and a rooflight window.

    Granted Lawful development Extension Loft or dormer +1 13 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications