Planning application
348 Pinhoe Road Exeter EX4 8AF
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension.
As published by the council, reference 24/0335/FUL
Application record
- Reference
- 24/0335/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 22 Mar 2024
- Validated
- 22 Mar 2024
- Decided
- 10 Jun 2024
- Ward
- Mincinglake And Whipton
- Decision by
- Delegated Decision
- Postcode
- EX4 8AF
Timeline
Dates from the published record
-
22 Mar 2024
Received by Exeter
-
10 Jun 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Devon
57 applications on PlanIndex · across 4 councils · 79% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
34 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Honeylands Children's Assessment Centre Pinhoe Road Exeter EX4 8AD
Demolition of air raid shelter and pad foundation as part of demolition works ahead of construction of new C2 Care Home.
Decided Lawful development Demolition 8 docs -
311 Pinhoe Road Exeter Devon EX4 8AD
Installation of white PVCu Orangery.
Granted Full applications Extension 8 docs -
22 Kennerley Avenue Exeter Devon EX4 8BW
Hip to gable loft conversion, rear dormer, rear extension
Decided Lawful development Extension Loft or dormer 7 docs -
1 Whipton Village Road Exeter EX4 8AN
Change of use of from dwelling (C3 use) to 9 person HMO (sui generis use). Alterations including attic conversion, and replacement windows.
Granted Full applications Loft or dormer Windows or glazing 17 docsDomestic -
330 Pinhoe Road Exeter Devon EX4 8AF
Boundary wall & replacement fence (retrospective)
Granted Full applications 15 docsSmall domestic -
Vranch House Pinhoe Road Exeter Devon EX4 8AD
Extension to existing school for single storey therapy suite and two storey equipment store.
Granted Full applications Extension 22 docsSmall domestic
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension