Planning application
2 Farleys Court Fore Street Topsham EX3 0HJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of chimney.
As published by the council, reference 24/0298/FUL
Application record
- Reference
- 24/0298/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 13 Mar 2024
- Validated
- 17 Jun 2024
- Decided
- 28 Aug 2024
- Ward
- Topsham
- Decision by
- Delegated Decision
- Postcode
- EX3 0HJ
Timeline
Dates from the published record
-
13 Mar 2024
Received by Exeter
-
17 Jun 2024
Validated
Checked as complete and ready for consideration.
-
28 Aug 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
14 applications on PlanIndex · across 2 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Bradfords Workshop Fore Street Topsham EX3 0HJ
Discharge of conditions 8 (landscaping scheme), 9 (secure cycle parking) and 10 (bird boxes) of planning permission 22/1439/FUL granted 03 May 2023.
Decided Conditions 4 docs -
Bradfords Workshop Fore Street Topsham Exeter Devon EX3 0HJ
Demolition of existing buildings and redevelopment to provide 2 no. 3 bed dwellings with widened access lane, cycle parking, landscaping and associated works (Revision of withdrawn application ref. 22/0454/FUL) (Revised plans).
Granted Full applications Demolition 61 docs -
74B Fore Street Topsham Exeter Devon EX3 0HQ
Loft conversion and remodelling to create additional second floor living space
Refused Heritage and listed buildings Loft or dormer 13 docs -
74B Fore Street Topsham Exeter Devon EX3 0HQ
Loft conversion and remodelling to create additional second floor living space
Refused Full applications Loft or dormer 14 docs -
First Floor 76 Fore Street Topsham EX3 0HQ
Prior approval application for change of use from commercial office (Use Class E) to 1 bed dwelling flat (C3 Use Class).
Granted Prior approval 11 docsDomestic -
Higher Riverdale Exe Street Topsham EX3 0JL
Demolition of 2 Commercial Storage / Workshop Buildings and Construction Of 1 Dwelling.
Granted Full applications Demolition 17 docsDomestic
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension