Planning application
22 Retreat Road Topsham EX3 0LF
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Rear Extension and landscaping.
As published by the council, reference 24/0278/FUL
Application record
- Reference
- 24/0278/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 9 Mar 2024
- Validated
- 12 Mar 2024
- Decided
- 6 May 2024
- Ward
- Topsham
- Decision by
- Delegated Decision
- Postcode
- EX3 0LF
Timeline
Dates from the published record
-
9 Mar 2024
Received by Exeter
-
12 Mar 2024
Validated
Checked as complete and ready for consideration.
-
6 May 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Topsham
32 applications on PlanIndex · across 7 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
19 Ashford Road Topsham Exeter Devon EX3 0LA
Single storey rear and side extensions, new front porch, external and internal alterations.
Granted Full applications Extension 9 docsSmall domestic -
17 Ashford Road Topsham EX3 0LA
Demolition of existing garage, store and conservatory, construction of a side extension, dormer, alterations and enlarged driveway
Refused Full applications Extension Loft or dormer +1 19 docs -
17 Ashford Road Topsham EX3 0LA
Landscaping proposals pursuant to condition 3 of consent 25/0576/FUL.
Granted Conditions 6 docs -
Clockhouse 14 Riverside Road Topsham Exeter Devon EX3 0LR
Carport in front garden.
Withdrawn Full applications 4 docs -
1 Denver Road Topsham EX3 0BS
Replacement of the existing softwood single glazed sliding sash windows on the front elevation, with new wood painted sliding sash windows with individual sealed double-glazing units, and the replacement of the crittle style metal framed single glazed windows on the rear elevation, with new painted wood casement windows with individual sealed double-glazing units.
Granted Full applications Windows or glazing 16 docs -
1 Denver Road Topsham EX3 0BS
Replace existing softwood single glazed sliding sash windows on front elevation, with new wood painted sliding sash windows with individual sealed double-glazing units, and the replacement of the crittle style metal framed single glazed windows on the rear elevation, with new painted wood casement windows with individual sealed double-glazing units.
Granted Heritage and listed buildings Windows or glazing 16 docs
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension