Planning application
103 Wardrew Road Exeter EX4 1EZ
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Addition of solar panels to the top of the rear flat roof dormer.
As published by the council, reference 24/0202/FUL
Application record
- Reference
- 24/0202/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 22 Feb 2024
- Validated
- 26 Feb 2024
- Decided
- 16 Apr 2024
- Ward
- St Thomas
- Decision by
- Delegated Decision
- Postcode
- EX4 1EZ
Timeline
Dates from the published record
-
22 Feb 2024
Received by Exeter
-
26 Feb 2024
Validated
Checked as complete and ready for consideration.
-
16 Apr 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Exeter
49 applications on PlanIndex · across 3 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
127 Wardrew Road Exeter EX4 1EZ
New single storey rear extension on the footprint of existing single storey extension
Decided Lawful development Extension 7 docsSmall domestic -
88 Buddle Lane Exeter EX4 1JJ
Timber shed in garden (retrospective application)
Granted Full applications 12 docsSmall domestic -
81 Wardrew Road Exeter EX4 1EZ
Loft conversion including a change from a hip to a gable, dormer window and a velux along with associated internal works.
Decided Lawful development Loft or dormer Windows or glazing 6 docs -
62 Buddle Lane Exeter EX4 1JJ
Single storey rear extension measuring 4.45m deep, maximum height 3.3m and height of eaves 2.7m.
Granted Prior approval Extension 11 docsSmall domestic -
19 Stafford Road Exeter Devon EX4 1EX
Single storey rear 3.0m extension at ground floor level and roof conversion works including dormer window.
Decided Lawful development Extension Loft or dormer +1 9 docsSmall domestic -
59 Wardrew Road Exeter EX4 1HA
Rear dormer and roof lights to the front.
Decided Lawful development Loft or dormer 16 docs
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension