Skip to content
PlanIndex Get alerts
Menu

Planning application

12 Park Lane Exeter Devon EX4 9HL

Granted Exeter 23/0345/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of Decking to rear extension.

As published by the council, reference 23/0345/FUL

Application record

Reference
23/0345/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
11 Mar 2023
Validated
5 Apr 2023
Decided
3 May 2023
Ward
Pinhoe
Decision by
Delegated Decision
Postcode
EX4 9HL

Timeline

Dates from the published record

  1. 11 Mar 2023

    Received by Exeter

  2. 5 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 3 May 2023

    Decision issued: Permitted

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 14 Park Lane Exeter EX4 9HL

    25/1816/FUL Submitted 21 Dec 2025 18m away

    Demolition of existing garage and porch and erection of a two-storey side and single storey front extension to the dwelling with further single storey side and rear extension with raised terrace/ decking to the rear.

    Granted Full applications Extension Demolition 21 docs
    Small domestic
  • 14 Park Lane Exeter EX4 9HL

    26/0524/NMA Submitted 8 Apr 2026 53m away

    Amendment of selected windows, including omission of 2no, and addition of 2no. rooflights to the approved 25/1816/FUL

    Granted Amendments Loft or dormer Windows or glazing 6 docs
  • 31 Park Lane Exeter Devon EX4 9HL

    21/1050/FUL Submitted 1 Jul 2021 64m away

    Demolition of existing garage and out-building. Single storey rear extension with alterations to existing rear dormer and removal of chimney.

    Granted Full applications Extension Loft or dormer +1 12 docs
    Small domestic
  • 8 Bindon Road Exeter EX4 9HN

    25/1119/TPO Submitted 17 Aug 2025 99m away

    TPO 493 OAK T1 Please refer to the Arboricultural Report Following the above report being completed, we are seriously concerned about the potential risks that this tree poses due to the defect that has been highlighted: "The junction of the western stem is a point of weakness and it is likely to fail. If it fails, stems would fall into at least two neighbouring gardens and would also strike the trampoline, they may also strike neighbouring property. On this basis, the value of the property is high. The estimated strike impact from the stems failing is high. Therefore, the risk of harm from this mode of failure is moderate. It would therefore be prudent to intervene". Other Oak trees along the boundary have had to be removed in the past due to causing subsidence and other issues to properties. The tree report finds a number of dead branches throughout the canopy, the taper and weight distribution along many of the lateral branches is suboptimal, making them more vulnerable to breakage in strong winds. In addition, some of the lower lateral branches in the northern and the eastern aspects hyperextend beyond the general crown profile. There are several branch tears visible around the main branch structure, where previous branch failures have occurred. To mitigate the potential harm / damage / injury to our family and property, and our neighbours properties, we would like this tree to be removed.

    Split decision Trees 10 docs
  • Sycamores The Grove Park Lane Exeter EX4 9HT

    23/0374/TPO Submitted 16 Mar 2023 144m away

    there are two trees on the right boundry of my house. For the last few years big branches of these trees regularly fall off and have caused injury. Two days ago it caused damaged to the fence of my decking and remaining fence is in danger as well as danger to people. I wish to have permission to removed all unhealthy tree branches / part of the tree to abolish this risk to myself, other people to the right of my house and damage to the property

    Granted Trees 6 docs
    Small domestic
  • 4 The Poplars Park Lane Exeter EX4 9HH

    26/0268/FUL Submitted 24 Feb 2026 148m away

    Demolition of single story roof to bedroom 5. Extension to enlarge bedroom 5 and provide new wetroom. Replacement roof to conservatory. Convert first floor of garage into carers accommodation. Reform steps accessing garage. Provide new decking to rear courtyard for level access and new external lift to access garden.

    Granted Full applications Extension Roofing +1 13 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications