Planning application
Southfield House Higher Duryard Pennsylvania Road Exeter Devon EX4 5BQ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side extension.
As published by the council, reference 23/0322/LPD
Application record
- Reference
- 23/0322/LPD
- Type
- Lawfulness of Proposed Use/Development
- Status
- Decided
- Decision
- Granted As published: Was lawful use
- Received
- 7 Mar 2023
- Validated
- 20 Mar 2023
- Decided
- 1 May 2023
- Ward
- Duryard And St James
- Decision by
- Delegated Decision
- Postcode
- EX4 5BQ
Timeline
Dates from the published record
-
7 Mar 2023
Received by Exeter
-
20 Mar 2023
Validated
Checked as complete and ready for consideration.
-
1 May 2023
Decision issued: Was lawful use
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Florian Winkler Architect Agent, an architecture practice
24 applications on PlanIndex · across 4 councils · 72% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 1 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Duryard Villa Higher Duryard Pennsylvania Road Exeter EX4 5BQ
83% historically approved · decision due ~24 Jul
Two-storey side extension and car port.
Awaiting decision Full applications Extension 34 docs -
Penhill Higher Duryard Pennsylvania Road Exeter EX4 5BQ
T004 - Turkey oak - Raise crown on western aspect - remove lowest limb to primary (photographed). Balance lower crown on eastern side by raising over garden to ensure approx. 1.5-2m clearance over young specimen trees beneath.
Granted Trees 5 docs -
Alta Higher Duryard Pennsylvania Road Exeter EX4 5BQ
carry out some tree work to a holm oak tree that has previously had a stem split out from the top you can see by the photos where I would like to reduce the crown to by approximately 2m. also the tree is leaning heavily over the drive. I?d also like to do this to reduce weight and sail effect of the tree in high winds to reduce the chance of falling in future. I believe there is a blanket TBO on the shaded in green area on the photos I attached going up the road side of the property. The red lines in the photos I?ve attached is where I would like to reduce the crown to
Granted Trees 8 docs -
Alta Higher Duryard Pennsylvania Road Exeter Devon EX4 5BQ
Variation of Condition 2 relating to 22/1021/FUL; Seek to make alterations to the outbuilding and dormer windows.
Granted Amendments Loft or dormer Windows or glazing 10 docs -
Duryard Villa Higher Duryard Pennsylvania Road Exeter EX4 5BQ
29/10/2024T1 - Monterey Pine Suggested Works: Tip reduce all extending limbs across canopy by 1-2 metres for weight alleviation, maximum diameter of cuts (MDC) 70mm. Crown lift above garden to 3m above ground level, MDC - 1 @ 100mm, remaining at 50mm. Remove major hazardous deadwood as necessary T2 - Oak Suggested Works: Crown reduce by approximately 1.5 metres to previous pruning points, MDC 25mm. T3 - Beech Suggested Works: Crown reduce by approximately 2 metres to previous pruning points, MDC 40mm. Rationale: The mature and spreading Monterey Pine has lost several limbs over the last two years and it is predicted that more will fail, reduction of the extending limbs is to reduce the chance and risk of limb failure. The remaining works are proposed as part of the reasonable and responsible management of these large trees. All works are considered arboriculturally appropriate and will have little effect on the tree's health and physiological processes.
Split decision Trees 5 docs -
15 Argyll Road Exeter Devon EX4 4RX
Replacement and extended balcony area to upper ground floor
Granted Full applications 9 docs
Other lawful development applications
In Exeter
-
26/1478/LPD Awaiting decision
17 Southbrook Road Exeter EX2 6JA
Loft conversion to include hip to gable and rear dormer.
-
26/1135/LED Granted
25 East John Walk Exeter EX1 2EP
House in multiple occupation for four people (C4 use) (Certificate of lawfulness of existing use)
-
26/1225/LPD Granted
Marcus House, Julius House And Augustus House, New North Road Exeter EX4 4HL
Replacement external materials including spandrel panels, metal cladding, render and brickwork and insertion of cavity barriers
-
26/1218/LPD Granted
7 Jennifer Close Exeter EX2 4RB
Certificate of Lawfulness for proposed demolition of ground floor rear extension and construction of a single storey pitched roof side extension.
-
26/1222/LPD Granted
53 Argyll Road Exeter EX4 4RX
Proposed roof conversion and replacement of upper part (superstructure) of an existing rear extension