Planning application

Royal Devon And Exeter Hospital Barrack Road Exeter Devon

Granted Exeter 22/1597/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retain shipping container structure temporarily for two years as a staff vaccination centre.

As published by the council, reference 22/1597/FUL

Application record

Reference
22/1597/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
16 Nov 2022
Validated
13 Feb 2023
Decided
5 Apr 2023
Ward
Priory
Decision by
Delegated Decision

Site history

Applications at this address on the Exeter register

This site has had 2 applications since 2019: 2 approved, 0 refused.

  • 19/1773/DIS Granted

    Royal Devon And Exeter Hospital Barrack Road Exeter Devon

    Discharge of conditions 7 (Travel Plan), 8 (Cycle Parking) and 11 (plant noise) of planning permission 17/1818/FUL RD&E MRI/PET CT unit.

    Decided 13 Feb 2020 Conditions

Timeline

Dates from the published record

  1. 16 Nov 2022

    Received by Exeter

  2. 13 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 5 Apr 2023

    Decision issued: Permitted

  4. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

5 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Exeter granted permission on 5 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Royal Devon And Exeter Hospital Barrack Road Exeter EX2 5DW

    25/1084/FUL Submitted 8 Aug 2025 8m away

    Retention and change of use of existing shipping container structure (former staff vaccination centre) for use as new base for Exeter Hospital Radio for a temporary period of 5 years.

    Granted Full applications 21 docs
  • Royal Devon And Exeter Hospital Barrack Road Exeter

    25/1080/TPO Submitted 7 Aug 2025 32m away

    T189 - Monterey Pine. Remove broken branch, cut back long low westerly limb by approximately 3-4m to upright growth point, diameter of cut approximately 100mm T233-T237 - Lime. Crown lift to give 3m clearance over car parking, maximum diameter of cut 25mm T264 - Lime. Cut back to give 2m clearance off building. Justification: T189 has a broken branch in crown which needs removing on safety grounds and there's a long, etiolated limb overhanging highway, this needs shortening to reduce risk of this limb failing onto the highway. Trees 233-237 have low branches overhanging car parking that need removing to facilitate car parking T264 has branches resting on building and they need pruning back to give sufficient clearance

    Granted Trees 4 docs
  • Royal Devon And Exeter Hospital Barrack Road Exeter Devon

    19/1773/DIS Submitted 18 Dec 2019 96m away

    Discharge of conditions 7 (Travel Plan), 8 (Cycle Parking) and 11 (plant noise) of planning permission 17/1818/FUL RD&E MRI/PET CT unit.

    Granted Conditions 11 docs
  • Royal Devon And Exeter Hospital Barrack Road Exeter

    24/0716/FUL Submitted 24 Jun 2024 160m away

    Two and three storey extensions, and elevated link corridor at Level 2, in courtyard on eastern side of main building

    Granted Full applications Extension 33 docs
  • Royal Devon And Exeter Hospital Barrack Road Exeter

    26/0732/DIS Submitted 20 May 2026 160m away

    Discharge of condition 4 of Planning Permission Ref. 25/1760/VOC, granted on 20 January 2026, relating to biodiversity enhancements

    Granted Conditions 4 docs
  • Royal Devon And Exeter Hospital Barrack Road Exeter

    25/1760/CONR Submitted 10 Dec 2025 160m away

    Variation of Condition 2 of Planning Permission Ref. 24/0716/FUL, granted on 30 January 2025, to amend design of scheme for two and three storey extensions, and elevated link corridor at Level 2, in courtyard on eastern side of main building

    Granted Amendments Extension 12 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications