Planning application
9 Curlew Way Exeter Devon EX4 4SW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior approval application (Class AA) to add an additional storey to dwelling house.
As published by the council, reference 22/1327/PDA
Application record
- Reference
- 22/1327/PDA
- Type
- Prior Approval - Household Add Storey
- Status
- Permitted
- Decision
- Granted As published: Prior Approval Required and Granted
- Received
- 30 Aug 2022
- Validated
- 23 Dec 2022
- Decided
- 16 Mar 2023
- Ward
- Duryard And St James
- Decision by
- Delegated Decision
- Postcode
- EX4 4SW
Site history
Applications at this address on the Exeter register
This site has had 2 applications since 2022: 2 approved, 0 refused.
-
23/0008/TPO Granted
9 Curlew Way Exeter Devon EX4 4SW
T1 reduce holm oak in rear garden by approximately 3m (1m below previous cut points). Tree has excessive lean and split in limb. Reduction to remove excess weight and improve likely condition and longevity of tree.
Timeline
Dates from the published record
-
30 Aug 2022
Received by Exeter
-
23 Dec 2022
Validated
Checked as complete and ready for consideration.
-
16 Mar 2023
Decision issued: Prior Approval Required and Granted
-
1 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Avalon Planning Ltd Agent, a planning consultancy registered in Bideford
Active · incorporated 2015 · Bideford
31 applications on PlanIndex · across 8 councils · 79% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 16 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
9 Curlew Way Exeter EX4 4SW
Replace garage door with 1x window and door to form new entrance porch.
Granted Full applications Extension Windows or glazing 10 docsSmall domestic -
9 Curlew Way Exeter EX4 4SW
Certificate of Lawfulness for proposal to remove the existing external stairs, sliding front sliding doors and recess entrance door to infill with bricked wall and one window.
Granted Lawful development Extension Windows or glazing 9 docs -
9 Curlew Way Exeter Devon EX4 4SW
T1 reduce holm oak in rear garden by approximately 3m (1m below previous cut points). Tree has excessive lean and split in limb. Reduction to remove excess weight and improve likely condition and longevity of tree.
Granted Trees 3 docs -
10 Curlew Way Exeter EX4 4SW
T002 - Sycamore - To be pollarded at 6m due to Squirrel damage - Client is keen to keep as wildlife habitat
Granted Trees 6 docs -
6 Curlew Way Exeter Devon EX4 4SW
Single storey rear extension extending a maximum 5.7 m from rear elevation, height to eaves 2.7m and maximum overall height 3.3m.
Granted Prior approval Extension 5 docsSmall domestic -
6 Curlew Way Exeter EX4 4SW
136 Monterey Pine Reduce height by approximately 4m. Maximum diameter of cuts 150mm. Exposed to new wind stresses. Slight reduction reducing the forces exerted on the main stem during periods of severe weather. 137 Oak Remove southern limb at 4.5m bifurcation, diameter of cut approximately 250mm. 142 Oak Crown lift to south by removing two lowest live branches back to trunk 137 & 142 - Trees weighted over the garden having suppressed by the other trees growing to the north. Reduce dominance over the property. 143 Oak Remove. Unable to reach its full potential. 144 Oak Remove southern stem. Leans at an excessive angle over the gardens to the south.
Split decision Trees 6 docs
Other prior approval applications
In Exeter
-
26/1471/PD Awaiting decision
42 Chard Road Exeter EX1 3AX
Prior approval for single storey rear extension measuring 6m deep x 3.9m max. height x 2.9m eaves height.
-
26/1032/PDPV Granted
Ashford Llp Ashford House Grenadier Road Exeter EX1 3LH
Installation of roof mounted 104.88kW solar PV system comprising of 228 x Canadian Solar 460w modules
-
26/1394/PDPV Awaiting decision
1 The Lyndons Lyndhurst Road Exeter EX2 4PT
Installation of a roof-mounted 15-panel solar photovoltaic (PV) array.
-
26/1383/PD Awaiting decision
22 Lower Hill Barton Road Exeter EX1 3EH
Prior Approval for a single storey rear extension measuring 4.40 m deep x 2.7 m high x 2.70 eaves height.
-
26/0912/PDPV Granted
Mardon House Wonford Road Exeter EX2 4UD
Installation of 160 solar panels and associated works