Skip to content
PlanIndex Get alerts
Menu

Planning application

The Old Malthouse Bartholomew Street East Exeter Devon EX4 3BG

Granted Exeter 22/1279/FUL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New windows and doors to front and rear elevations.

As published by the council, reference 22/1279/FUL

Application record

Reference
22/1279/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
15 Sep 2022
Validated
1 Dec 2022
Decided
28 Apr 2023
Ward
St Davids
Decision by
Delegated Decision
Postcode
EX4 3BG

Timeline

Dates from the published record

  1. 15 Sep 2022

    Received by Exeter

  2. 1 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 28 Apr 2023

    Decision issued: Permitted

  4. 2 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Exeter

135 applications on PlanIndex · across 7 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Old Malthouse Bartholomew Street East Exeter Devon EX4 3BG

    22/1328/PDCD Submitted 15 Sep 2022 1m away

    Prior approval (Class MA) for a change of use from a restaurant (Use Class E) to 4 no. self-contained flats (Use Class C3).

    Granted Prior approval New dwelling 25 docs
  • Land Adjacent To City Gate Hotel Junction Of Bartholomew Street East And Iron Gate Exeter EX4 3EA

    24/0182/FUL Submitted 14 Feb 2024 30m away

    Rebuilding of collapsed section of City Wall

    Granted Full applications 23 docs
  • The Old Malthouse Bartholomew Street East Exeter EX4 3BG

    24/1214/DIS Submitted 16 Oct 2024 41m away

    Discharge of Condition 4 relating to 20/1349/FUL

    Refused Conditions 8 docs
  • Bartholomew Street East Exeter

    26/1286/CAT Submitted 25 Aug 2026 46m away

    97% historically approved · decision due ~20 Oct

    Job 83328 - Bartholomew Street East Description: Southern side of canopy against car park wall and ingressing into parking bays. Crown part reduce away from building gaining 2m clearance. 4 op hrs priority 3 Job 83329 - Bartholomew Street East Description: - Up against car park building and encroaching on parking bays. Crown part reduce away to gain >2m clearance 3 op hrs priority 3 Job 83330 - Bartholomew Street East Description: - Up against and ingressing onto car parking bays. Crown par reduce 3 op hrs priority 3 Job 83331 - Bartholomew Street East Description: - Up against and ingressing onto car parking bays. Crown par reduce 3 op hrs priority 3

    Awaiting decision Trees 4 docs
  • 6 Iron Bridge Exeter EX4 3RB

    26/0503/TELN Submitted 2 Apr 2026 54m away

    The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus

    Decided Telecoms
  • 1 Mary Arches Street Exeter EX4 3FQ

    24/1496/DIS Submitted 16 Dec 2024 57m away

    Discharge of Condition 10 of Planning Permission Ref. 17/0922/FUL (granted on 10 October 2017) relating to sustainable construction (BREEAM)

    Decided Conditions 5 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications