Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Ashford Road Topsham Exeter Devon EX3 0LA

Granted Exeter 19/1485/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear and side extensions, new front porch, external and internal alterations.

As published by the council, reference 19/1485/FUL

Application record

Reference
19/1485/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
18 Oct 2019
Validated
5 Nov 2019
Decided
24 Dec 2019
Ward
Topsham
Decision by
Delegated Decision
Postcode
EX3 0LA

Timeline

Dates from the published record

  1. 18 Oct 2019

    Received by Exeter

  2. 5 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 24 Dec 2019

    Decision issued: Permitted

  4. 16 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Budleigh Salterton

2 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 Ashford Road Topsham EX3 0LA

    24/0645/FUL Submitted 10 Jun 2024 22m away

    Demolition of existing garage, store and conservatory, construction of a side extension, dormer, alterations and enlarged driveway

    Refused Full applications Extension Loft or dormer +1 19 docs
  • 17 Ashford Road Topsham EX3 0LA

    25/1047/DIS Submitted 2 Aug 2025 22m away

    Landscaping proposals pursuant to condition 3 of consent 25/0576/FUL.

    Granted Conditions 6 docs
  • 22 Retreat Road Topsham EX3 0LF

    24/0278/FUL Submitted 9 Mar 2024 94m away

    Rear Extension and landscaping.

    Granted Full applications Extension 8 docs
  • 63 High Street Topsham EX3 0DY

    24/1437/DIS Submitted 4 Dec 2024 98m away

    Submission of balcony details as required by condition 4 of consent 21/1565/FUL.

    Granted Conditions 7 docs
  • 1 Denver Road Topsham EX3 0BS

    24/0477/FUL Submitted 30 Apr 2024 116m away

    Replacement of the existing softwood single glazed sliding sash windows on the front elevation, with new wood painted sliding sash windows with individual sealed double-glazing units, and the replacement of the crittle style metal framed single glazed windows on the rear elevation, with new painted wood casement windows with individual sealed double-glazing units.

    Granted Full applications Windows or glazing 16 docs
  • 1 Denver Road Topsham EX3 0BS

    24/0478/LBC Submitted 30 Apr 2024 116m away

    Replace existing softwood single glazed sliding sash windows on front elevation, with new wood painted sliding sash windows with individual sealed double-glazing units, and the replacement of the crittle style metal framed single glazed windows on the rear elevation, with new painted wood casement windows with individual sealed double-glazing units.

    Granted Heritage and listed buildings Windows or glazing 16 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications