Skip to content
PlanIndex Get alerts
Menu

Planning application

Dockholm Lock Bennett Street Long Eaton Derbyshire

Granted Erewash 0608/0074 L.B.C. - Alts, exts (Grade 2)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

LISTED BUILDING CONSENT FOR THE FIXING OF TWO SAFETY SIGNS ONTO THE GATE BALANCE BEAM

As published by the council, reference 0608/0074

Application record

Reference
0608/0074
Type
L.B.C. - Alts, exts (Grade 2)
Status
Determined
Decision
Approve with Cond(Delegated)
Received
30 Jun 2008
Validated
30 Jun 2008
Decided
15 Aug 2008
Decision by
Delegated

Site history

Applications at this address on the Erewash register

This site has had 3 applications since 2008: 3 approved, 0 refused.

  • 0721/0029 Granted

    Dockholm Lock, Bennett Street, Long Eaton, Derbyshire

    Remove The Failed 12m Section Of Wall And Install A 39m Long Line Of Trench Sheet Piles Directly In Front Of The Existing Wall To Form A Continuous Straight Mooring From The Start Of The Narrows To The Upstream Weir Structure. The Original Copings

    Decided 9 Sep 2021 Heritage and listed buildings
  • 0310/0009 Granted

    Dockholm Lock Bennett Street Long Eaton Derbyshire

    LISTED BUILDING CONSENT FOR REMOVAL OF TWO TIMBER STEPS ON STEEL BALANCE BEAMS ON THE BOTTOM LOCK GATES AND REPLACEMENT STEEL STEPS FITTED

    Decided 26 Apr 2010

Timeline

Dates from the published record

  1. 30 Jun 2008

    Received by Erewash

  2. 15 Aug 2008

    Decision issued: Approve with Cond(Delegated)

  3. 9 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Erewash granted permission on 15 August 2008, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Erewash's portal will say. Our guide explains the common types.