Skip to content
PlanIndex Get alerts
Menu

Planning application

Ormiston Ilkeston Academy, King George Avenue, Ilkeston, Derbyshire, DE7 5HS

Granted Erewash 0223/0010 Full planning permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations To Existing Car Park, Including The Removal Of Low Level Retaining Wall, Level And Gradient Adjustments And Improved Drainage. removal Of Existing Timber Boundary Fencing And Replacement With New Railings. Removal Of Double Vehicle Gates And

As published by the council, reference 0223/0010

Application record

Reference
0223/0010
Type
Full planning permission
Status
Determined
Decision
Approve with Conditions
Received
3 Feb 2023
Validated
3 Feb 2023
Decided
31 Mar 2023
Ward
Little Hallam (Historical);Little Hallam
Parish
Ilkeston
Decision by
Delegated
Postcode
DE7 5HS

Timeline

Dates from the published record

  1. 3 Feb 2023

    Received by Erewash

  2. 31 Mar 2023

    Decision issued: Approve with Conditions

  3. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Erewash

  • PA/2026/0376 Granted

    UNIT D, DALES SHOPPING CENTRE, THE VILLAGE, WEST HALLAM, ILKESTON, DE7 6JA

    Erection of a single storey new unit for a cafe (class E) with an area of outdoor seating to the front and replacement boundary wall to side with an height increase of 300mm.

    8 Jul 2026 Full applications
  • PA/2026/0484 Status unknown

    Land Adjacent And To The East of 9 Powtrell Place, Ilkeston, DE7 5SW

    Change of use of land to facilitate the erection of a single storey facilities building, two storage containers, hard standing and parking facilities with access off Erewash Drive, and the erection of a 2.2 metre boundary fence for the use of canal boat restorations.

    25 Aug 2026 Full applications
  • PA/2026/0325 Granted

    BREEZE WAY, MAIN ROAD, MORLEY, ILKESTON, DE7 6DG

    Demolition of existing dwelling and outbuildings and replace with a new detached dwelling. Erection of new entrance gates

    9 Jun 2026 Full applications
  • PA/2026/0315 Granted

    40 GREEN LANE, OCKBROOK, DERBY, DE72 3SE

    Change of Use of land to rear of residential dwelling to domestic curtilage, demolition of storage buildings, erection of replacement buildings of similar form to create extensions to the original dwelling and to form ancillary accommodation

    30 Jun 2026 Full applications
  • PA/2026/0497 Status unknown

    Land to the south of Derby Road, Ilkeston, DE7 5FB

    Erection of replacement boundary fencing.

    19 Aug 2026 Full applications