Archive · Epsom and Ewell · 2024
Planning applications in Epsom and Ewell, May 2024
Epsom and Ewell recorded 4 planning applications in May 2024, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, May 2024
Newest first
-
24/00564/FUL Granted
23 Beaconsfield Place Epsom Surrey KT17 4BD
Ground and first floor rear extension and alterations to fenestration to existing dwelling. New two storey, 3 bedroom detached dwelling including loft accommodation adjacent to 23 Beaconsfield Place, removal of tree T004 and replacement thereof with London Plane
-
24/00597/REM Granted
140 And 142 Ruxley Lane West Ewell Surrey KT19 9JS
Variation of Condition 2 (Approved Plans) of planning permission 23/00588/FUL to make elevational amendments to Plots 1 -12 and 13 -14. Re-locate and alter the footprint of the refuse store and re-location of the cycle store
-
24/00598/COND Granted
140 And 142 Ruxley Lane West Ewell Surrey KT19 9JS
Confirmation of Compliance with Condition(s): 4 (External Materials), 5 (Access and Cross Over Provision), 6 (Tracking Details), 7 (Surface Water Drainage Scheme), 8 (Landscaping), 9 (Ground Contamination) of planning permission 23/00588/FUL
-
24/00528/TPO Granted
76 Hookfield Epsom Surrey KT19 8JG
The tree is the single pine tree (30/T26) at the property; the works involve underpinning the nearest parts of the property to the tree to a depth as explained in the method statement - the precise depth depends upon the depth of roots found. This work does not need planning permission based on the Town & Country Planning Act s55(2)(a) definition of development. However, the works will cut roots of the pine tree & thus this application is submitted in case the council consider it necessary. These works are necessitated as a result of refusal of tree works application 23/00806/TPO. The reason for the works are due to root-induced clay shrinkage subsidence. In the event this application is refused then a more expensive engineering option (e.g. a piled raft) will be necessary although it may have no significantly less impact on the pine tree. The reasonably foreseeable loss arising from the council's refusal of this application may be as much as £200,000 as alternative accommodation for several months will be required.
Other months in 2024
- January 2024 1
- April 2024 1
- May 2024 4
- June 2024 3
- July 2024 8
- August 2024 21
- September 2024 68
- October 2024 93
- November 2024 58
- December 2024 10