Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Alexandra Road Epsom Surrey KT17 4BH

Awaiting decision Epsom and Ewell 26/00874/FUL Full applications

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition and re-construction of existing garage block, due to subsidence.

As published by the council, reference 26/00874/FUL

Application record

Reference
26/00874/FUL
Category
Full applications
Status
Awaiting decision
Validated
13 Aug 2026
Postcode
KT17 4BH

Timeline

Dates from the published record

  1. 13 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  2. 14 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epsom and Ewell took a median of 51 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Epsom and Ewell for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • ALDI 2 Alexandra Road Epsom Surrey

    25/00945/COND Submitted 12 Aug 2025 50m away

    Confirmation of Compliance with Condition(s): 7 (Written Scheme of Investigation) of planning permission 23/00402/FUL allowed at appeal

    Granted Conditions 6 docs
  • ALDI 2 Alexandra Road Epsom Surrey KT17 4BJ

    26/00740/COND Submitted 22 Jun 2026 50m away

    Confirmation of Compliance with Condition(s): 9 (Badger Monitoring Surveys) of planning permission 23/00402/FUL allowed at appeal

    Granted Conditions 2 docs
  • ALDI 2 Alexandra Road Epsom Surrey KT17 4BJ

    26/01012/COND Submitted 28 Aug 2026 50m away

    84% historically approved · decision due ~23 Oct

    Confirmation of Compliance with Condition(s): 12 (Service, Delivery and Operational Management Plan), 21 (Travel Plan) of planning permission 23/00402/FUL allowed at appeal

    Awaiting decision Conditions 4 docs
  • ALDI 2 Alexandra Road Epsom Surrey KT17 4BJ

    26/00808/ADV Submitted 8 Jul 2026 50m away

    87% historically approved · decision due ~2 Sep

    Display of 1No. H Post Mount incorporating 3No. internally illuminated signs to display a corporate logo sign, opening hours sign and a new services signage, Display of 2No. non-illuminated vinyl on glazing signs, display of 1No. non-illuminated vinyl on glazing logo sign, display of 2No. internally illuminated wall mounted logo signs, display of 1No. non-illuminated vinyl on glazing welcome sign and display of 1No. non-illuminated vinyl on glazing logo sign

    Awaiting decision Advertising Windows or glazing
  • ALDI 2 Alexandra Road Epsom Surrey KT17 4BJ

    26/00054/COND Submitted 19 Jan 2026 50m away

    Confirmation of Compliance with Condition(s): 7 (Programme of Archaeological Work) of planning permission 23/00402/FUL (allowed at appeal)

    Granted Conditions 6 docs
  • ALDI 2 Alexandra Road Epsom Surrey KT17 4BJ

    26/00225/ADV Submitted 24 Feb 2026 52m away

    Display of 1No H Post Mount incorporating 4No. internally illuminated signs to display a corporate logo sign, opening hours sign, signage zone and EV charge sign. Display of 2No. non-illuminated vinyl on glazing signs, display of 1No. non-illuminated vinyl on glazing logo sign, display of 2No. internally illuminated logo fascia signs, display of 1No non-illuminated vinyl on glazing welcome sign and display of 1No. non-illuminated vinyl on glazing logo sign

    Granted Advertising Windows or glazing 10 docs

In Epsom and Ewell

  • 26/00901/FUL Awaiting decision

    1 Windmill Avenue Epsom Surrey KT17 1LL

    Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)

    Full applications
  • 26/00961/FUL Awaiting decision

    9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT

    Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.

    Full applications
  • 26/00900/FUL Awaiting decision

    First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH

    Replacement of front elevation windows at first and second floor

    Full applications
  • 26/00948/FUL Awaiting decision

    1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP

    Retrospective application for a side boundary fence 1.2m high

    Full applications
  • 26/00842/FUL Awaiting decision

    38 The Warren Worcester Park Surrey KT4 7DL

    Change of use from a single detached dwellinghouse (Use Class C3) to a private residential care home (Use Class C2)

    Full applications