Skip to content
PlanIndex Get alerts
Menu

Planning application

49 Pine Hill Epsom Surrey KT18 7BH

Granted Epsom and Ewell 26/00678/FLH Full Planning Permission (Householder)

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

First floor side extension and single storey side and rear extension (following demolition of existing side garage and rear conservatory) incorporating removal one chimney stack and internal alterations and reconfigurations with associated works.

As published by the council, reference 26/00678/FLH

Application record

Reference
26/00678/FLH
Type
Full Planning Permission (Householder)
Status
Decided
Decision
Application Permitted
Received
8 Jun 2026
Validated
8 Jun 2026
Decided
3 Aug 2026
Ward
Woodcote And Langley Vale
Decision by
Delegated Decision
Postcode
KT18 7BH

Site history

Applications at this address on the Epsom and Ewell register

This site has had 2 applications since 2025: 1 approved, 1 refused.

  • 25/01065/FLH Refused

    49 Pine Hill Epsom Surrey KT18 7BH

    First floor side extension and single storey side and rear extension following demolition of existing conservatory incorporating associated works and internal reconfiguration

    Decided 12 Nov 2025 Householder

Timeline

Dates from the published record

  1. 8 Jun 2026

    Received by Epsom and Ewell

  2. 30 Jul 2026

    Added to PlanIndex

  3. 3 Aug 2026

    Decision issued: Application Permitted

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Epsom and Ewell granted permission on 3 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 49 Pine Hill Epsom Surrey KT18 7BH

    25/01065/FLH Submitted 18 Sep 2025 2m away

    First floor side extension and single storey side and rear extension following demolition of existing conservatory incorporating associated works and internal reconfiguration

    Refused Householder Extension Demolition 31 docs
    Small domestic
  • 11 Woodcote End Epsom Surrey KT18 7BB

    25/01210/TPO Submitted 13 Oct 2025 39m away

    Sycamore - Located on Woodcote End opposite property 11 Woodcote End (within A1 of TPO 18). Reduce the lateral growth of the tree back within the boundary of the road itself (Woodcote End).

    Granted Trees 10 docs
  • 16 Pine Hill Epsom Surrey KT18 7BG

    26/00883/FLH Submitted 17 Aug 2026 49m away

    87% historically approved · decision due ~12 Oct

    Single storey front porch extension and two storey side extension with associated works following demolition of existing garage

    Awaiting decision Extension Demolition
    Small domestic
  • 59 Pine Hill Epsom Surrey KT18 7BH

    26/00405/CLP Submitted 3 Apr 2026 59m away

    Lawful Development Certificate - Proposed Use: Single storey rear extension and alterations to fenestration

    Granted Lawful development Extension Windows or glazing 8 docs
    Small domestic
  • 37 Pine Hill Epsom Surrey KT18 7BH

    25/01511/TPO Submitted 23 Dec 2025 71m away

    Felling of 1 dead Scots Pine and 1 moribund Scots Pine located in the rear garden (within G8 of TPO 18) - Exempt tree work

    Granted Trees 6 docs
  • 19 Chantry Hurst Epsom Surrey KT18 7BW

    25/00772/FLH Submitted 7 Nov 2025 90m away

    Part garage conversion to accommodate a habitable space, first floor rear extension and alterations to rear fenestration.

    Granted Householder Extension Windows or glazing 7 docs
    Small domestic

In Epsom and Ewell

  • 26/00697/FLH Granted

    43 Woodstone Avenue Stoneleigh Surrey KT17 2JS

    First floor side and rear extension along with a roof extension to accommodate a habitable space incorporating rear dormers and roof lights

    12 Jun 2026 Householder
  • 26/00750/FLH Granted

    64 Chadacre Road Stoneleigh Surrey KT17 2HE

    Single storey rear extension

    24 Jun 2026 Householder
  • 26/00743/FLH Granted

    11 Danetree Close West Ewell Surrey KT19 9SU

    Single storey front garden outbuilding

    23 Jun 2026 Householder
  • 26/00648/FLH Granted

    3 Lindsay Close Epsom Surrey KT19 8JJ

    Construction of a single-storey rear and side extension including conversion of the existing garage into a snug incorporating a new mono-pitch roof on over the front porch and garage roof and incorporating Velux windows on the extensions roofs (following demolition of the existing single storey rear conservatory)

    22 Jun 2026 Householder
  • 26/00744/FLH Refused

    38 Beaufort Way Ewell Surrey KT17 2PS

    Demolition of the existing front boundary wall and the removal of adjacent trees and vegetation. Formation of a replacement boundary wall incorporating timber fencing, including all associated groundworks.

    23 Jun 2026 Householder