Planning application
22 Wimborne Close Epsom Surrey KT17 4DP
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Roof extension to accommodate a habitable space incorporating a rear dormer
As published by the council, reference 26/00262/FUL
Application record
- Reference
- 26/00262/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 17 Mar 2026
- Validated
- 17 Mar 2026
- Decided
- 11 May 2026
- Ward
- College
- Decision by
- Delegated Decision
- Postcode
- KT17 4DP
Timeline
Dates from the published record
-
17 Mar 2026
Received by Epsom and Ewell
-
11 May 2026
Decision issued: Application Permitted
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
123 applications on PlanIndex · across 15 councils · 68% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
85 Church Road Epsom Surrey KT17 4DN
Replacement of existing roof tiles.
Granted Householder Roofing 13 docsDomestic -
9 St Martins Close Epsom Surrey KT17 4DR
Lawful Development Certificate - Proposed Use: Single storey rear extension and alteration to fenestration
Granted Lawful development Extension Windows or glazing 9 docsSmall domestic -
71 Church Road Epsom Surrey KT17 4DN
Single storey side infill extension with gable roof
Granted Householder Extension 27 docsSmall domestic -
Street Record Outside 93 Church Road Epsom Surrey
BT intends to install fixed line broadband electronic communications apparatus outside 93 Church Road.
Granted Telecoms 2 docs -
4 Andrews Close Epsom Surrey KT17 4EX
Lawful Development Certificate - Proposed Use: Alterations to existing front porch
Granted Outline Extension 9 docsSmall domestic -
Edge Of Pitt Place Boundary Pitt Place Church Street Epsom Surrey KT17 4PY
97% historically approved · decision due ~22 Jul
Fell chestnut tree on boundary of Pitt Place
Awaiting decision Trees
Other full applications applications
In Epsom and Ewell
-
26/00901/FUL Awaiting decision
1 Windmill Avenue Epsom Surrey KT17 1LL
Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)
-
26/00961/FUL Awaiting decision
9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT
Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.
-
26/00900/FUL Awaiting decision
First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH
Replacement of front elevation windows at first and second floor
-
26/00948/FUL Awaiting decision
1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP
Retrospective application for a side boundary fence 1.2m high
-
26/00842/FUL Awaiting decision
38 The Warren Worcester Park Surrey KT4 7DL
Change of use from a single detached dwellinghouse (Use Class C3) to a private residential care home (Use Class C2)