Planning application
Launderclean 33 Waterloo Road Epsom Surrey KT19 8EX
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
First floor rear outrigger extension including a roof raise of the outrigger, part hip to gable loft conversion incorporating a rear and front dormer and front rooflights. Reconfiguration of the existing 3 bedroom residential unit into a two bedroom residential unit and a one bedroom residential unit. Associated landscaping and provision of refuse and cycle storage and associated works.
As published by the council, reference 26/00196/FUL
Application record
- Reference
- 26/00196/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 19 Feb 2026
- Validated
- 19 Feb 2026
- Decided
- 15 Apr 2026
- Ward
- Town
- Decision by
- Delegated Decision
- Postcode
- KT19 8EX
Timeline
Dates from the published record
-
19 Feb 2026
Received by Epsom and Ewell
-
15 Apr 2026
Decision issued: Application Permitted
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Sutton
19 applications on PlanIndex · across 4 councils · 53% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Launderclean 33 Waterloo Road Epsom Surrey KT19 8EX
Prior Approval Schedule 2, Part 3, Class M: Change of use of existing launderette (Sui Generis) to residential (C3) to create 1 dwelling
Refused Prior approval 15 docsDomestic -
Launderclean 33 Waterloo Road Epsom Surrey KT19 8EX
Prior Approval Schedule 2, Part 3, Class M: Change of use of existing launderette (Sui Generis) to residential (C3) to create 1 dwelling
Refused Prior approval 14 docsDomestic -
Bodhi Eden 29 - 31 Waterloo Road Epsom Surrey KT19 8EX
Confirmation of Compliance with Condition(s): 9 (i) and (ii) (Ground Contamination), 10 (Remediation Strategy) of planning permission 21/02006/OUT
Granted Conditions 10 docs -
3 Gosfield Road Epsom Surrey KT19 8HF
Alterations to the front porch and single storey rear extension following demolition of rear conservatory. Modifications to the side extension to accommodate a flat roof and alterations to fenestration.
Granted Householder Extension Demolition +1 13 docsSmall domestic -
19 Gosfield Road Epsom Surrey KT19 8HF
Lawful Development Certificate - Proposed Use: Widening of an existing vehicular crossover including dropped kerb to access a permeable surface driveway
Refused Lawful development 8 docs -
7 Chase End Epsom Surrey KT19 8TN
Variation of Condition 7 (Removal of Permitted Development Rights (Schedule 2, Part 1, Classes A, B, C, D and E)) of Planning Permission 20/00728/OUT, varied under 20/01868/REM (Erection of 1 x 2 bedroom and 2 x 3 bedroom semi-detached houses including new access, associated external works and parking, following demolition of No. 7 Chase End) to retain permitted development rights under Classes C and D
Granted Conditions Demolition 7 docs
Other full applications applications
In Epsom and Ewell
-
26/00901/FUL Awaiting decision
1 Windmill Avenue Epsom Surrey KT17 1LL
Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)
-
26/00961/FUL Awaiting decision
9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT
Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.
-
26/00900/FUL Awaiting decision
First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH
Replacement of front elevation windows at first and second floor
-
26/00948/FUL Awaiting decision
1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP
Retrospective application for a side boundary fence 1.2m high
-
26/00842/FUL Awaiting decision
38 The Warren Worcester Park Surrey KT4 7DL
Change of use from a single detached dwellinghouse (Use Class C3) to a private residential care home (Use Class C2)