Planning application
Deacon St Ebbas Hospital Hook Road Epsom Surrey KT19 8QJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Refurbishment of treatment rooms and associated treatment areas to provide air conditioning and fresh air ventilation incorporating the installation of 2No. external air condenser units and 4No. vent pipes. Internal alterations including a new loft access for maintenance purposes
As published by the council, reference 25/01347/FUL
Application record
- Reference
- 25/01347/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 26 Nov 2025
- Validated
- 26 Nov 2025
- Decided
- 19 Mar 2026
- Ward
- Court
- Decision by
- Delegated Decision
- Postcode
- KT19 8QJ
Timeline
Dates from the published record
-
26 Nov 2025
Received by Epsom and Ewell
-
19 Mar 2026
Decision issued: Application Permitted
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
14 applications on PlanIndex · across 6 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Deacon St Ebbas Hospital Hook Road Epsom Surrey KT19 8QJ
Listed Building Consent: Refurbishment of treatment rooms and associated treatment areas to provide air conditioning and fresh air ventilation incorporating the installation of 2No. external air condenser units and 4No. vent pipes. Internal alterations including a new loft access for maintenance purposes
Granted Heritage and listed buildings 39 docs -
Derby House St Ebbas Hospital Hook Road Epsom Surrey
Oak Tree (T1) - Remove infested limb.
Granted Trees 5 docs -
St Ebbas Hospital Hook Road Epsom Surrey KT19 8QJ
Prune trees around building and overflow car park. Reduce various small trees and shrubs at front of building. Reduce back and cut line of willow trees - the tree lines includes approximately 8-10 willow trees.
Granted Trees 5 docs -
5 Pine Close Epsom Surrey KT19 8FN
Lawful Development Certificate - Proposed Use: Roof extension to accommodate a habitable space incorporating side dormer and roof lights
Granted Lawful development Extension Loft or dormer 16 docs -
5 Pine Close Epsom Surrey KT19 8FN
Single storey rear extension with rooflights
Granted Householder Extension Loft or dormer 13 docsSmall domestic -
13 Mulberry Close Epsom Surrey KT19 8FX
Roof extension incorporating a rear dormer and 6no. of rooflights to front roofslope (Application for a Certificate of Lawful Development - Proposed).
Granted Lawful development Extension Loft or dormer 10 docs
Other full applications applications
In Epsom and Ewell
-
26/00901/FUL Awaiting decision
1 Windmill Avenue Epsom Surrey KT17 1LL
Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)
-
26/00961/FUL Awaiting decision
9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT
Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.
-
26/00900/FUL Awaiting decision
First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH
Replacement of front elevation windows at first and second floor
-
26/00948/FUL Awaiting decision
1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP
Retrospective application for a side boundary fence 1.2m high
-
26/00842/FUL Awaiting decision
38 The Warren Worcester Park Surrey KT4 7DL
Change of use from a single detached dwellinghouse (Use Class C3) to a private residential care home (Use Class C2)