Planning application
15 Bluegates Ewell Surrey KT17 2SA
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Permitted Development Prior Notification: Single storey rear extension (5.20m in depth, maximum height of 3.95m and eaves height of 2.60m).
As published by the council, reference 25/01344/PDE
Application record
- Reference
- 25/01344/PDE
- Type
- General Permitted Development - Extns
- Status
- Decided
- Decision
- Prior Approval Not Required
- Received
- 18 Nov 2025
- Validated
- 18 Nov 2025
- Decided
- 15 Dec 2025
- Ward
- Stoneleigh
- Decision by
- Delegated Decision
- Postcode
- KT17 2SA
Timeline
Dates from the published record
-
18 Nov 2025
Received by Epsom and Ewell
-
15 Dec 2025
Decision issued: Prior Approval Not Required
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
2 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
19 Bluegates Ewell Surrey KT17 2SA
TPO175/A1 - T1 - To reduce the Sycamore in the back garden by 40% to create more light.
Granted Trees 7 docs -
19 Bluegates Ewell Surrey KT17 2SA
TPO175/A1 - T1 - To reduce the Sycamore in the back garden by 40% to create more light.
Granted Trees 7 docs -
BP Connect Ewell Service Station London Road Ewell Surrey KT17 2BW
63% historically approved · decision due ~27 Aug
Installation of 3 no. new Electric Vehicle (EV) charging units to serve six EV parking bays. Works include the removal of one existing car wash bay and associated EV infrastructure, alongside alterations to the site's parking layout and forecourt.
Awaiting decision Full applications -
Development Site At 65 London Road Ewell Surrey KT17 2BL
87% historically approved · decision due ~1 Oct
Non-Material Amendments to planning permission 23/00817/FUL to construct additional brick faced retaining walls to manage and support differing site levels
Awaiting decision Amendments -
Development Site At 65 London Road Ewell Surrey KT17 2BL
Confirmation of Compliance with Condition: 16 (Ground/Groundwater Contamination) of planning permission 23/00817/FUL
Granted Conditions 11 docs -
6 Bluegates Ewell Surrey KT17 2SA
Single storey rear extension (following demolition of existing rear conservatory).
Granted Householder Extension Demolition 9 docsSmall domestic
Other prior approval applications
In Epsom and Ewell
-
26/00747/PDE Granted
8 Northey Avenue Cheam Surrey SM2 7HR
Notification for Prior Approval for a 8m deep single storey rear extension (Maximum height of 3.50m and eaves height of 2.94m).
-
26/00737/PDE Granted
11 Kirby Close Ewell Surrey KT19 0PW
Notification for Prior Approval for a 6m deep single storey rear extension (Maximum height of 2.70m and eaves height of 2.70m).
-
26/00567/PDE Granted
4 Cheyham Gardens Cheam Surrey SM2 7NH
Notification for Prior Approval for a 6m deep single storey rear extension (Maximum height of 3.36m and eaves height of 2.75m).
-
26/00489/PDCOU Refused
Launderclean 33 Waterloo Road Epsom Surrey KT19 8EX
Prior Approval Schedule 2, Part 3, Class M: Change of use of existing launderette (Sui Generis) to residential (C3) to create 1 dwelling
-
26/00569/PDE Granted
94 Horton Hill Epsom Surrey KT19 8ST
Permitted Development Prior Notification: Single storey rear extension (4.00m in depth, maximum height of 3.00m and eaves height of 2.66m).