Planning application
11 Shere Avenue Cheam Surrey SM2 7JX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a two storey residential dwelling house in the rear garden of 11 Shere Avenue. Formation of a new vehicular cross over including dropped kerb to access new permeable surface driveway, hard and soft landscaping and associated works
As published by the council, reference 25/00989/FUL
Application record
- Reference
- 25/00989/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 15 Sep 2025
- Validated
- 15 Sep 2025
- Decided
- 10 Nov 2025
- Ward
- Nonsuch
- Decision by
- Delegated Decision
- Postcode
- SM2 7JX
Timeline
Dates from the published record
-
15 Sep 2025
Received by Epsom and Ewell
-
10 Nov 2025
Decision issued: Application Permitted
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
15 applications on PlanIndex · across 4 councils · 85% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
34 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 Shere Avenue Cheam Surrey SM2 7JX
Confirmation of Compliance with Condition(s): 3 (Materials), 4 (Construction Transport Management Plan), 5 (SuDS Scheme), 6 (Hard and Soft Landscaping), 7 (Sustainability Measures), Part Discharge of Condition 9 (Cycle Storage) of planning permission 25/00989/FUL
Granted Conditions 24 docs -
8 Westcott Way Cheam Surrey SM2 7JY
Ground floor front porch and side extension. Change of side access brick wall to timber wall.
Granted Householder Extension 9 docsSmall domestic -
14 Hillside Road Ewell Surrey KT17 3EH
Erection of single storey rear extension, first floor side extension (above existing garage), amendments to existing roof design and single storey outbuilding to the rear of garden.
Granted Householder Extension 12 docsSmall domestic -
14 Westcott Way Cheam Surrey SM2 7JY
Conversion of garage to accommodate a habitable space and single storey rear extension
Granted Householder Extension 12 docsSmall domestic -
16 Holmwood Road Cheam Surrey SM2 7JR
Widening of existing vehicular access including dropped kerb to access a permeable surface driveway
Granted Householder 15 docsSmall domestic -
14 Holmwood Road Cheam Surrey SM2 7JR
Single storey rear extension following demolition of existing rear conservatory
Granted Householder Extension Demolition 13 docsSmall domestic
Other full applications applications
In Epsom and Ewell
-
26/00901/FUL Awaiting decision
1 Windmill Avenue Epsom Surrey KT17 1LL
Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)
-
26/00961/FUL Awaiting decision
9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT
Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.
-
26/00900/FUL Awaiting decision
First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH
Replacement of front elevation windows at first and second floor
-
26/00948/FUL Awaiting decision
1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP
Retrospective application for a side boundary fence 1.2m high
-
26/01001/FUL Awaiting decision
Lidl 1 Epsom Court 40 Upper High Street Epsom Surrey KT17 4ER
Installation of 1 x EV Charger upstand (under PD) and associated feeder pillar cabinet and car parking layout amendments