Planning application
11 Poole Road West Ewell Surrey KT19 9SQ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Permitted Development Prior Notification: Single storey rear extension (3.50m in depth, maximum height of 3.00m and eaves height of 3.00m).
As published by the council, reference 24/01459/PDE
Application record
- Reference
- 24/01459/PDE
- Type
- General Permitted Development - Extns
- Status
- Decided
- Decision
- Prior Approval Not Required
- Received
- 18 Nov 2024
- Validated
- 18 Nov 2024
- Decided
- 15 Dec 2024
- Ward
- West Ewell
- Decision by
- Delegated Decision
- Postcode
- KT19 9SQ
Timeline
Dates from the published record
-
18 Nov 2024
Received by Epsom and Ewell
-
15 Dec 2024
Decision issued: Prior Approval Not Required
-
31 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Norwich
196 applications on PlanIndex · across 15 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
32 Poole Road West Ewell Surrey KT19 9SH
Permitted Development Prior Notification: Single storey rear extension (4.00m in depth, maximum height of 4.00m and eaves height of 3.00m).
Granted Prior approval Extension 12 docsSmall domestic -
6 Daleside Road West Ewell Surrey KT19 9SR
Lawful Development Certificate - Proposed Use: Single storey rear extension following demolition of the existing conservatory. Hip to gable roof extension to accommodate a habitable space incorporating a rear dormer and front roof lights
Granted Lawful development Extension Loft or dormer +1 9 docsSmall domestic -
5 Poole Road West Ewell Surrey KT19 9SQ
87% historically approved · decision due ~3 Sep
Permitted Development Prior Notification: Single storey rear extension (3.60m in depth, maximum height of 3.60m and eaves height of 2.25m).
Awaiting decision ExtensionSmall domestic -
1 Poole Road West Ewell Surrey KT19 9SQ
85% historically approved · decision due ~21 Sep
Lawful Development Certificate - Proposed Use: Formation of a vehicular crossover including dropped kerb incorporating alterations to the boundary wall
Awaiting decision Lawful developmentSmall domestic -
9 Daleside Road West Ewell Surrey KT19 9SR
Permitted Development Prior Notification: Single storey rear extension (3.65m in depth, maximum height of 3.20m and eaves height of 3.00m).
Granted Prior approval Extension 9 docsSmall domestic -
32 Crosslands Road West Ewell Surrey KT19 9SS
Oak Tree (397/T1) - Remove - There are other oaks and large trees along the boundary with the playing fields that I would not consider wildlife to be overly affected by its removal. I would also be happy to plant a more appropriately sized apple tree in its place which would continue to provide food and shelter for pollinators and wildlife.
Granted Trees 12 docs
Other prior approval applications
In Epsom and Ewell
-
26/00747/PDE Granted
8 Northey Avenue Cheam Surrey SM2 7HR
Notification for Prior Approval for a 8m deep single storey rear extension (Maximum height of 3.50m and eaves height of 2.94m).
-
26/00737/PDE Granted
11 Kirby Close Ewell Surrey KT19 0PW
Notification for Prior Approval for a 6m deep single storey rear extension (Maximum height of 2.70m and eaves height of 2.70m).
-
26/00567/PDE Granted
4 Cheyham Gardens Cheam Surrey SM2 7NH
Notification for Prior Approval for a 6m deep single storey rear extension (Maximum height of 3.36m and eaves height of 2.75m).
-
26/00489/PDCOU Refused
Launderclean 33 Waterloo Road Epsom Surrey KT19 8EX
Prior Approval Schedule 2, Part 3, Class M: Change of use of existing launderette (Sui Generis) to residential (C3) to create 1 dwelling
-
26/00569/PDE Granted
94 Horton Hill Epsom Surrey KT19 8ST
Permitted Development Prior Notification: Single storey rear extension (4.00m in depth, maximum height of 3.00m and eaves height of 2.66m).