Planning application
From Mogden Sewage Treatment Works To The River Thames Upstream Of Teddington Weir
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Order granting Development Consent for the Teddington Direct River Abstraction project
As published by the council, reference 24/01346/CNA
Application record
- Reference
- 24/01346/CNA
- Type
- Consultation from Neighbouring Authority
- Status
- Decided
- Decision
- Granted As published: No Objections
- Received
- 11 Oct 2024
- Validated
- 11 Oct 2024
- Decided
- 5 Nov 2024
- Ward
- Out Of Borough
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
11 Oct 2024
Received by Epsom and Ewell
-
5 Nov 2024
Decision issued: No Objections
-
30 Jul 2026
Added to PlanIndex
Documents
2 documents on file for this application
- Decision
- Consultation Letter
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Epsom and Ewell granted permission on 5 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Epsom and Ewell
-
26/00949/OUT Refused
Land To The Rear Of Danehurst Court Alexandra Road Epsom Surrey KT17 4BY
Outline application for a three storey residential development for up to 8 units (All matters reserved except Access, Layout and Scale).
-
26/01107/CNA Granted
Buckles 55 Yew Tree Bottom Road Epsom Downs Surrey KT17 3NQ
Beach tree on front drive near main door entrance to house. Lowest limb west facing with old cable bracing in it. Reduce end branches only by 2 metre. 2 limb south east facing lowest limb in that direction. Reduce end branches by 2 metres. Remove all dead wood through out whole crown. Reasons for work a recent limb fell out of the tree on neighbours drive.
-
26/01122/CLPF Granted
79 Parklawn Avenue Epsom Surrey KT18 7SJ
Lawful Development Certificate - Proposed Use: Hip to gable roof extension incorporating a rear dormer, front roof lights and side facing window
-
26/01101/CMA Granted
The Chalk Pit College Road Epsom Surrey KT17 4JA
Details of External Material submitted pursuant to Condition 2 of planning permission ref: EP25/00900/CMA dated 20 February 2026.
-
26/01040/CLPF Granted
39 Riverholme Drive West Ewell Surrey KT19 9TG
Lawful Development Certificate - Proposed Use: Formation of a vehicular crossover including dropped kerb to access a new permeable surface block paved driveway